My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005838
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
935
>
3500 - Local Oversight Program
>
PR0545617
>
ARCHIVED REPORTS_XR0005838
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2020 1:59:00 PM
Creation date
4/28/2020 1:22:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005838
RECORD_ID
PR0545617
PE
3528
FACILITY_ID
FA0005557
FACILITY_NAME
RIPON FARM SERVICE
STREET_NUMBER
935
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102007/2011
CURRENT_STATUS
02
SITE_LOCATION
935 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ' Site Background Information - Ripon Farm Service <br /> • Page 6 of 9 <br /> • BTEX compounds have not been detected in wells MW-1 through MW-10 for at least three <br /> consecutive quarters. <br /> • DIPE has been detected in ground water samples from wells MW-2 through MW-4,MW-8, <br /> and VW-2A at concentrations as high as 17µg/l(MW-8).TBA has been detected in samples <br /> ' from wells MW-1 through MW-4, MW-8, and soil vapor wells VW-1 and VW-2 at <br /> concentrations as high as 360µg/l(VW-2B).MTBE has been detected in samples from wells <br /> MW-1 through MW-4, MW-6, and MW-8 at concentrations as high as 500 4g/1 (MW-8). <br /> TAME has been detected in well MW-8 at a maximum concentration of 38 µg/l. 1,2-DCA <br /> has been detected in wells MW-1,MW-2, MW-4, MW-9,and MW-10 at concentrations as <br /> ' high as 300 µg/1 (MW-4). <br /> i <br /> ' SOIL AND GROUND WATER REMEDIATION <br /> On 25,26,and 27 April 2000,four air-sparge pilot borings and eleven soil vapor extraction soil pilot <br /> ' borings were advanced at the site; with borings IAS 1 through IAS4 completed as 2-inch diameter <br /> air sparging wells, drilled to a total depth of 25 feet bsg with a 5-foot screen interval. Two vertical <br /> zones of remediation wells were installed as follows: borings VW3A, VW8, and VW9A were <br /> ' completed as vapor extraction wells,drilled to a total depth of approximately 13 feet bsg with 5-foot <br /> screen intervals, and borings VW3B,VW4, VWS, VW6, VW7, VW9B, VW10, and VW11 were <br /> completed as vapor extraction wells, drilled to a total depth of approximately 18 feet bsg and <br /> ' completed with 5-foot screen intervals. <br /> Soil samples were collected from air-sparge pilot borings IAS 1 to IAS4 ahead of the drill bit using <br /> ' a core barrel. TPH-g was detected in each of the samples at concentrations as high as 990 mg/kg. <br /> TPH-d was also detected in each sample analyzed at concentrations as high as 1,000 mg/kg. BTEX <br /> compounds were detected in each sample analyzed.Benzene was detected at concentrations as high <br /> 1 as 0.63 mg/kg at a depth of 18 feet bsg. The only fuel additive detected was 1,2 DCA at a <br /> concentration up to 20 micrograms per kilogram (gg/kg). <br /> A Solleco catalytic-oxidation soil vapor extraction (SVE) unit began operation at the site in <br /> December 2000. The system was monitored monthly during operation and after re-start events. <br /> During each monitoring event, the SVE flow rate, vacuum (potential), and concentrations of <br /> ' hydrocarbons in the extracted soil-vapor were measured, and a set of soil-vapor samples were <br /> collected by AGE personnel. The unit operated at an average extraction flow rate of 85 and <br /> ' 90 standard cubic feet per minute (cfm). A compressor-based EnviroSparge IAS system was <br /> installed at the site in August 2001.The IAS system delivered 6 cfm at a pressure of 10 pounds per <br /> square inch (psi), adequate to displace the static water within each sparge well. In addition, the <br /> dissolved oxygen in the ground water wells was measured to monitor the efficiency of the IAS <br /> system. <br /> ' Advanced GeoEnvironntental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.