Laserfiche WebLink
16 December 2004 <br /> • AGE-NC Project No.'95-0137 <br /> ' Page 5 of 5 <br /> • Continued quarterly ground water monitoring, after the installation of the off-site well(s). <br /> 1 • Continuation'of a soil vapor extraction rebound response analysis for the duration of one <br /> additional quarter, if necessary. <br /> ' S.O. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by 1 <br /> ' environmental consultants practicing in this or similar localities. The findings were based upon <br /> analytical results provided by an independent laboratory.Evaluation of the hydrogeologic conditions <br /> at the site for the purpose of this investigation was made from a limited number of available data <br /> ' points (e.g., ground water and soil vapor samples) and subsurface conditions may vary away from <br /> these data points. No other warranty, expressed or implied, is made as to the professional <br /> interpretations, opinions and recommendations contained in this report. <br /> 1 <br /> 1 <br /> ' Advanced GeoEnvironmental,Inc. <br /> 1 ' <br />