Laserfiche WebLink
' 08 June 2001 <br /> AGE-NC Pioject No 95-0137 <br /> ' Page 2 of 9 <br /> The number of blows required to advance the sampler over each 6-inch increment of the 18-inch <br /> sampling interval was recorded on the boring logs Sampling equipment was washed in an Alconox <br /> solution and rinsed with water prior to each sampling run to reduce cross-contamination <br /> For each recovered sample, both ends of a selected sleeve were covered with Teflon sheets, capped <br /> and sealed with tape The samples were labeled, stored on ice and transported under chain-of-custody <br /> ' to McCampbell Analytical, Inc (MAI), a State of California Department of Health Services (DHS)- <br /> certified analytical laboratory <br /> ' <br /> 22 LOGGING <br /> ' Soil was extruded from a second brass sleeve or froze the unpreserved portions of the soil in the core <br /> barrel samples and were screened for the presence of organic vapor using an organic vapor meter <br /> t (OVM) equipped with a photo-ionization detector (PID Thermo Environmental 580A, 10 0 eV, <br /> calibrated to isobutylene), and the OVM readings were recorded on the boring log The soil was then <br /> visually described in accordance with the Unified Soil Classification System (see Appendix A) <br /> 2 3 WELL AND BORING COMPLETION <br /> ' �_ Pp �'Rgs )I, <br /> Bonngs IAS 1 through IAS4 were completed as air sparging wells using two-inch diameter PVC <br /> casing with 0 020-inch slotted screen Each well y1e drilled to a total depth of 25 feet bsg and was <br /> ' completed with a 5-foot screen interval as <br /> Borings VW3A, VW8 and VW9A were completed as vapor extraction wells using two-inch <br /> diameter PVC casing with 0 020-inch slotted screen These borings were drilled to a total depth of <br /> approximately 13 feet bsg and completed with a 5-foot screen intervals <br /> ' Borings VW3B,VW4, VW5, VW6, VW7, VW9B , VWIO and VW11 were completed as vapor <br /> extraction wells using two-inch diameter PVC casing with 0 020-inch slotted screen These borings <br /> were drilled to a total depth of approximately 18 feet bsg and completed with a 5-foot screen <br /> ' intervals <br /> i <br />' The filter pack (No 2112 Lonestar sand) was installed approximately I foot above the screened <br /> intervals in the air-sparge wells IAS-1 to IAS-4 and vapor wells VW-3 through VW-I 1 A nominal <br /> 1 5-foot bentonite pellet plug was then installed above the filter pack and hydrated The wells were <br />' then grouted to near the surface with portland cement Water-tight, traffic-rated well boxes were then <br /> installed over the wells As-built well diagrams are depicted on the boring logs in Appendix A <br /> 1 <br /> Advanced GcoEnviron[nental,Inc <br /> 1 <br />