Laserfiche WebLink
1 <br />' WORK REQUEST FORM <br /> M <br />' Date of Request 03/15/05 Requested Completion Date 03/16-18105 <br /> Prod Name Tuleburge Warehouse Prod No 98-263 <br />' Site Address 8200 N Hwv 99 Morada CA Task none <br /> 1 Project Manager John Lane Field Tech A Scoma <br /> Client Contact Rav Baglietto Phone No 209-468-0433 <br /> Regulatory Contact Jeffrey Wong, Phone No 209-468-0335 <br />' Approval Completion Date 0j �f17 • Af <br /> Check in with store clerk "Ab" when you arrive on site Let him know that you'll be sam ling <br /> 1 all the wells You will be urging and sampling all site wells VW1 is probably dry and wells <br /> EW1 (MWl) and EW2 can be sampled from sample ports <br /> 1 Measure DTW/DTB in each site well DTW reported to be Lap-proximately 68-70 from tops of <br /> casings The order for monitoring is MW14B MW7 MW8 MW16 MW15 MWi 1 MW10 <br /> lie MW9B MW13C MW5. EW2 MW12 MW6 MW3 EWI (MW1)_MW4. VEW1 <br /> Purge and sample all site wells in the order listed above Wells MW7. MW8 MW9B MW10 <br /> 1 MW11 MW14B MW15 and MW16 were all ND last time so you can reuse those drums Wells <br /> VW1 MW913 MW13C and MW14B are 4-inch wells All others are 2-inch Wells EW1 and <br /> EW2 are extraction wells and are actively purging You can transfer purge water directly into <br />' 300 gallon holding tank in treatments stem for disposal through the air stripper <br /> Of course, monitor wells for pH EC. temp and DTW <br /> 1 <br /> Sample all wells for TPHG/BTEX EPA 8015B/8021B and oxygenates. EDB 1 2-DCA EPA <br /> 8260B) Send samiies to Argon Labs for analysis EDF is required <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> i <br /> 1 <br /> 1 <br />