Laserfiche WebLink
1 <br /> 16 WORK REQUEST FORM <br /> 4 <br />' Date of Request 12/13/04 Requested Completion Date 12/14-16/04 <br /> Prod Name Tuleburge Warehouse _ __Prod No 98-263 <br /> Site Address 8200_N Hwy 99, Morada, CA Task none <br />' Project Manager John Lane Field Tech A Scoma <br /> Client Contact _Ray BagIietto „ Phone No 209-468-0433 <br />' Regulatory Contact Jeffrey Wong Phone N <br /> &2-- <br /> t ( 0 209-468-0335 <br />' Approval C7 — ..,., (2,16/6 6 q Completion Date <br />' Check in with store clerk "Ab" when you arrive on site Let him know thatyou'll be sampling <br /> all the wells You will be purging and sampling all site wells VW1 is probably dry and wells <br /> EW1 (MWI) and EW2 can be sampled from sample ports <br />' Measure DTW/DTB in each site well DTW reported to be approximately 66-70 from tops of <br /> casings The order for monitoring is MW14B MW7, MWS MW16 MWIS MWII MWIO <br /> MW9B MW13C MW6 MWS EW2 MW12 MW2 MW3 EW1 (MWI) MW4 VEWI <br /> Purge and sam le wells in order Wells MW7 MW$ MW9 MW10 MWI1. MW13 MW14 <br /> MW15 and MW16 were all ND last time so you can reuse those drums Wells VWI MW9B <br /> MW13C and MW14B are 4-inch wells All others are 2-inch You can transfer purve water <br /> directly into 300 gallon holding tank in treatment system for disposal through the air stripper if <br />' you like <br /> Of course, monitor wells for pH, EC temp and DTW <br />' <br /> Sample all wells for TPHG/BTEX EPA 8015B/802IB and oxygenates EDB 1,2-DCA (EPA <br /> 8260B Send samples to Argon Labs for analysis EDF is required <br /> I <br /> I <br />