Laserfiche WebLink
1 � <br /> 1 <br /> WORK REQUEST FORM <br />' Date of Request 3/15/04 Requested Completion D - <br /> p ate 3/16 17/Q4 <br />' Proi Name Tulebur e Warehouse Prod No 98-263 <br /> Site Address 8200 N H 99 Morada CA Task <br />' }r none <br /> Project Manager �, f�s� o Lane —Field-T60 A Scoma <br />' Client Contact R � a lietto <br /> Phone No 209-468-0433 <br /> Regulatory �h <br /> Reg ory Contact �effre Wo� ,s } <br />' n" -"k' � =Phone No 209-468-0335 <br /> Approval <br /> t <br /> Coriipletion ate ��Il b,l QUI P-r <br /> 1 Check in with store clerk "Ab" when ou arrive on s1te�, Let lnm <br /> .know all the wells You will be ur in and sampling all site we exce tt Wells ancludinl VEWI be lin <br /> Measure DTW/DTB in each site well DTW re orted to be avoroximatel 65-68 from tops of <br /> casings The order for monitoring is MW14B MW7 MW8. MW9 NMW6 MW10 MW11 <br /> 1 MW13C MWS MW12 rinse robe MW2 MW3 MW4 V <br /> {fix"��r <br /> � <br /> Pur e and sample wells in order Wells MW6 MW7 M 8 MW9 MW11 and MW14 <br /> 1 were all ND last time so you can reuse those drums Al "� er wells ihugt� <br /> MW1 VEWI MW9B MW13C and MW14B are 4-inch wells the <br /> All ors are 2-nchned Wells <br />' Of course monitor wells for pH, EC. temp and DTW <br /> Sample all wells for TPHG/BTEX EPA 8015B/8021B and oxy <br /> genates, EDB 1,2-DCA, <br />' ethanol methanol EPA 8260B Send samples to Argon Labs for analysis <br /> I <br /> I <br />