Laserfiche WebLink
SITE: SPEEDY MART/STOCKTON, CA. PAGE 2 OF 2 10/22/03 <br /> VEW-1 I NIA LOCATION VEW 1 MW-1 MW-2 MW.3 MW-4 <br /> START 15 10 STOP 1900 STARTTIME <br /> 1510 mEmuaamgwr 1300 <br /> FLOW VAC FLOW VAC STOP TIME <br /> (CFM) (H20) (CFM) (H20) I9 00 UNITS 1500 <br /> 22 CFM 50" 24 CFM 58" PID 2000+ PPM <br /> 18 30 VAC 58 H2O 079 048 014 047 <br /> FLOW 22 CFM <br /> MW-1 / PRODUCT TEMP 70 F <br /> TEDLAR PID 2000+ PPM <br /> SAMPLE VAC 58 H2O 083 05 0 17 041 <br /> VEW 10 START 1300 STOP 1500 1900 <br /> 1900 FLOW 24 CFM <br /> INFLUENT FLOW PRESS FLOW PRESS TEMP 70 F <br /> (CFM) (PSI) (CFM) (PSI) PID PPM <br /> STOP VAC H2O <br /> FLOW CFM <br /> TEMP F <br /> MW 2I 6732' DTW PIA PPM <br /> VAC H2O <br /> START 13 00 STOP 1900 FLOW CFM <br /> TEMP F <br /> FLOW PRESS FLOW PRESS P LD PPM <br /> (CFM) (PSI) (CFM) (PSI) VAC H2O <br /> FLOW CFM <br /> TEMP F <br /> PID PPM <br /> MW-3 / 6770' DTW VAC H2O <br /> FLOW CFM <br /> TEMIP <br /> START 1300 STOP 1900 F <br /> PID PPM <br /> FLOW PRESS FLOW PRESS VAC H2O <br /> (CFM) (PSI) (CFM) (PSI) FLOW CFM <br /> TEMP F <br /> PID PPM <br /> VAC H2O <br /> MW-4 / 67 64' D T W FLOW CFM <br /> TEMP F <br /> PID PPM <br /> START 1300 Smpp 19 00 <br /> VAC H2O <br /> FLOW PRESS FLOW PRESS FLOW CFM <br /> (CFM) (PSI) (CFM) (PSI) TEMP F <br /> PID PPM <br /> VAC H2O <br /> FLOW CFM <br /> TEMP F <br /> PID PPM <br /> VAC H2O <br /> START STOP FLOW CFM <br /> FLOW PRESS FLOW PRESS TEMP F <br /> (CFM) (PSI) (CFM) (PSI) PID PPM <br /> VAC H2O <br /> FLOW CFM <br /> TEMP <br /> MONITORING COMPLETED BY DEL-TECH GEOTECHNICAL SUPPORT(209)847 8757 SAMPLED BY <br />