Laserfiche WebLink
WORK REQUEST FORM <br />' Date of Request 712104 Requested Completion Date 716104 <br /> Pro, Name Tuleburge Warehouse Prod No 98-263 <br />' Site Address 8200 N HM 99 Morada CA Task none <br />' Project Manager John Lane Field Tech A Scoma <br />' Client Contact Ray Ba lietto Phone No 209-468-0433 <br /> Regulatory Contact Jeffrey Wong Phone No 209-468-0335 <br />' ApprovaI Completion Date Q-4J o 6 lay Ar E� <br />' Check in with store clerk "Ab" when you arrive on site Let him know thatyou'll be sampling <br /> wells You will be develonmg and sampling newly installed wells MW15 and MW16 You will <br /> also be surveying new wells You will also be [monitoring DTW in all site wells_ <br />' Measure DTW/DTB in all site wells DTW expect to be al3proximately 65-68 from tops of <br /> casin s The order for monitoring is MW14B MW7 MW8 MW9B MW6 MW10 MW11 <br /> MW15 MW16 MW13C MWS MW12 rinse robe MW2 MW3 MW4 VEWI MW1 <br /> Note if treatment system is running ((pumping in MW1) <br />' Develon and sample new wells MW15 and MW16 These are 2-inch wells completed to 80 feet <br /> bgs Of course, monitor wells for pH, EC, temp turbidity and DTW <br />' Sample wells for TPHG/BTEX EPA 8015B/8021B) and oxygenates EDB 1,2-DCA ethanol <br /> methanol (EPA 8260B) Send samples to Argon Labs for analysis <br /> Survey new wells and wells MWS if you can see rod MW6. MW9B MW10 MW11 MW12 <br /> MW 15 MW 16 MW8 Place transit as shown on attached mgp and measure angle between wells <br />' MW 11 set to 0 MW 12 MW 16 MW 15 Measure distance from transit to these wells using Joe <br /> as help Make sure to get an accurate distance using tae or hip chain make sure it is tau ht <br /> when measuring <br />