Laserfiche WebLink
WORK REQUEST FORM <br />' Date of Request 12/09/03 Requested Completion Date 12/12/03 <br /> Prot Name Tuleburae Warehouse _ Prol No 98-263 <br />' Site Address 8200 N Hwy 99, Morada, CA Task none <br />' Project Manager John Lane Field Tech A Scoma <br /> Client Contact Ray Baglietto_ Phone No 209-468-0433 <br /> Regulatory Contact Jeffrey Wong <br /> Phone No 209-468-0335 <br /> Approval tijN (� <br /> _.Completion Date <br />' Check in with store clerk "Ab" when you arrive on site Let him know thatyou'll be sam lm <br /> all the wells You will be purging and sampling all site wells exce t wells MW1 and VEW1 <br />' Measure DTW/DTB in each site well DTW reported to be a roximatel 65-68 from tops of <br /> casings The order for monitoring is MW14B MW7 MW8 MW9b MW6 MW10 MW11 <br /> MW13C, MW5, MW12 (rinse probe), MW2, MW3, MW4, VEW1, MW1 <br /> • Pure and sample wells in order (except MW1-INF and VEW1 Wells MW6 MW7 MW8 <br /> MW9 MW10 MW11 and MW14 were all ND Iast time so you can reuse those drums All <br /> other wells must be contained Wells MW1 VEW1 MW9B MW13C and MW14B are 4-mch <br /> wells All others are 2-inch <br />' Of course, monitor wells for PH, EC, temp and DTW <br /> Sample all wells for TPHG/BTEX EPA 8015B/8021B and oLcygenates, EDB 1,2-DCA, <br />' ethanol methanol EPA 8260B Send samples to Argon Labs for analysis <br /> 1 <br /> 1 <br /> 1 <br />