My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
9474
>
3500 - Local Oversight Program
>
PR0545623
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:57:04 PM
Creation date
4/28/2020 2:52:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545623
PE
3528
FACILITY_ID
FA0004968
FACILITY_NAME
CHEVRON 96155 (INACT)
STREET_NUMBER
9474
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95205
APN
08515003
CURRENT_STATUS
02
SITE_LOCATION
9474 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Chevron U.S.A. <br /> Page 3 <br /> PLAN IMPLEMENTATION <br /> Upon local regulatory authority agency approval of the remedial plan, an <br /> estimate of volatilizing vapors and potential health risk will be developed in <br /> accordance with guidelines established for such activities, utilizing the <br /> Sacramento County APCD Aeration of .Volatile Hydrocarbons From Soils risk model <br /> developed for estimation of volatile hydrocarbons emissions into the atmosphere <br /> and EPA Atmospherics Manual. Further, all necessary permits will be obtained <br /> from local health and air quality agencies prior to implementation of the <br /> remedial plan. <br /> PROPOSED PROJECT SCHEDULE <br /> Dames & Moore is prepared to proceed with implementation of the remedial <br /> plan upon approval from Chevron U.S.A. and the San Joaquin Environmental Health <br /> Department. A project: schedule for the scope of work described for the remedial <br /> plan is estimated as follows: <br /> TASK WEEK 1 LEEK 2 WEEK 3 WEEK 4 WEEK 5 <br /> Plan Review and <br /> Approval by Chevron <br /> Risk Modeling <br /> Plan Submission for <br /> Agency Review <br /> Permitting <br /> Excavation and <br /> Placement of Soils <br /> Aeration Begins <br /> The estimated time for aeration has not been developed as of the time of <br /> this proposal, since aeration efficiency is dependant upon weather conditions. <br /> However, a time estimate will be developed prior to plan implementation based <br /> upon the season of the year that aeration is actually commenced. <br /> In Dames & Moore's opinion, the remedial effort proposed should remove those <br /> areas of soil which exhibit residual gasoline contamination, resulting in no <br /> further action required for subsoil contamination at the subject property. <br /> Ground water monitoring wells installed at the subject property are proposed <br /> to be sampled and measured on a quarterly basis for ground water quality analysis <br /> and gradient evaluation. If at the culmination of one year the ground water <br /> DAMES & MOORE <br />
The URL can be used to link to this page
Your browser does not support the video tag.