My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005607
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
9474
>
3500 - Local Oversight Program
>
PR0545623
>
ARCHIVED REPORTS_XR0005607
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:29 PM
Creation date
4/28/2020 3:21:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005607
RECORD_ID
PR0545623
PE
3528
FACILITY_ID
FA0004968
FACILITY_NAME
CHEVRON 96155 (INACT)
STREET_NUMBER
9474
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95205
APN
08515003
CURRENT_STATUS
02
SITE_LOCATION
9474 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron U SA <br /> Page 11 <br /> The results of those analyses showed that a portion of the samples were not <br /> thoroughly aerated It was concluded that the tilling operation should continue for <br /> approximately 5 days for each lift of hydrocarbon-contanunated soil This sequence <br /> commenced on August 28, 1990 On August 29, 1990, California Petroleum Inc , the <br /> contractor performing the earthwork, requested that each of the stockpiles storing the <br /> hydrocarbon-contaminated soils be spread in one thick lift around the excavation near <br /> the center of the site It was felt the tilling activity could be more efficient if <br /> the soils were placed around the excavation, eliminating U-turns and wasted motion in <br /> the tilling process. The San Joaquin County Health Department approved this process <br /> The top and middle photos found on Plate 2, show the mounded contaminated soils before <br /> and after all stockpiled soils had been spread <br /> On August 29, 1990, a dust complaint was received by the San Joaquin County <br /> Health Department from neighboring residences From this point forward, California <br /> Petroleum Construction Company made an additional effort to minimize dust by ceasing <br /> operations dunng portions of the day when wind was a factor and by placing the <br /> stockpile of cleansed soil at a location to help block the movement of dust between <br /> the subject site and neighboring residences <br /> 16000-250-044 <br /> D\\IEs & MOORE <br />
The URL can be used to link to this page
Your browser does not support the video tag.