My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
749
>
2200 - Hazardous Waste Program
>
PR0523154
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2020 5:03:57 PM
Creation date
4/28/2020 4:27:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0523154
PE
2220
FACILITY_ID
FA0003870
FACILITY_NAME
SRH FOOD & GAS
STREET_NUMBER
749
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734309
CURRENT_STATUS
01
SITE_LOCATION
749 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PqU{,N <br /> ENVI OMENTAL HEALTH AARTMENT <br /> C9��PORa�P <br /> Donna K.Heran,R.E. S. <br /> SAN JOAQUIN COUNTY program Coordinators <br /> . <br /> Director 600 East Main Street, Stockton,California 95202 Kasey L.Foley,R.E.H.S. <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Robert McClellon,R.E.H.S. <br /> Jeff Carruesco,R.E.H.S. <br /> Web:www.sjgov.org/ehd Linda Turkatte,R.E.H.S. <br /> SITE HEALTH& SAFETY PLAN <br /> PART I PART II <br /> GENERAL SITE 14FORMATLQN EVALUATION OF POTENTIAL HAZARDS <br /> 1. Site Name: L Chemicals Hazards <br /> Address: 1E2 N/ ❑Carcinogens: <br /> Contact Person: h ❑Corrosives: <br /> Phone#: ❑Dusts: <br /> Proposed Date of investigation/inspec'on: ❑Explosives: / I <br /> Wlammables: 7y <br /> 2. Description and brief narrative of inspection activity: ❑ Inorganic Gases: <br /> ❑New UST installation ❑I JAR Investigation ❑Metals: <br /> ❑Tank Closure in Place ❑Tank/Pipe Repair ❑Oxidizers: <br /> ❑Tank/Pipe Removal ❑I I e-excavation ❑PCBs: <br /> ❑Sampling ❑ oring/Monitoring Well installation ❑Other: <br /> azardous Waste inspection ❑ iered Permitting inspection <br /> PART III <br /> 3. Specific Site h►formation: REQUIRED PERSONAL PROTECTIVE EQUIPMENT <br /> Tank No.: T ink Capacity: 1. Monitoring Equipment(Note:Monitoring instruments must be used for all <br /> Tank Content: T ink Age: operations unless appropriate rationale or restrictions are provided): <br /> Other: ❑Combustible Gas/Oxygen Meter <br /> ❑ Detector Tubes(specify): <br /> 4. Type of Operation: ❑ Photo ionization Detector <br /> ❑Organic Vapor Analyzer <br /> 5. Release History: ❑Other(specify): <br /> Evidence of leaks/soil contamination: ElYES [3NOfone(see below) <br /> Documented Groundwater contamina n: ❑YES ❑NO If monitoring instruments are not used,rationale or activity/area restrictions: <br /> Background and description of any p ious investigation or incidence: <br /> 2. Personal Protective Equipment <br /> 6. Potential Health&Safety Physical Coi ceras:(✓all that apply&describe) Level of Protection: ❑A ❑B ❑C OD <br /> ❑Heat or Cold Stress: OF(high ambient temp.) ®Hard Hat <br /> ❑Noise Sources: ®Safety Glasses/Goggles <br /> ❑Oxygen Deficiency: ®Steel toed/shank shoes or boots <br /> Excavation(falls,trips,slipping,ca a-ins): ElFlame retardant coveralls <br /> andling and Transfer of a Hazard Substance(fire,explosions,etc.):. ®Hearing protection <br /> ' J ❑Tyvek <br /> ❑Confined space entry(explosions): ❑Respirator: ❑APR ❑SCBA <br /> �eavy equipment(physical injury trauma resulting from moving A/P Cartridge: <br /> uipment): ®Safety vest <br /> ❑Other(specify): )''wo-way communication p f 1 ol'-' <br /> ❑Other(specify): <br /> 7. Anticipated Biological Hazards: <br /> ❑Snakes 15,Asects ❑Rodents ❑Poisonous Plants PART IV <br /> ❑Other/Unknown(specify): PLAN APPROVAL <br /> 8. Narrative(provide all information whic could impact Health and Safety, Plan Prepared b Date: <br /> e.g.,power lines,integrity of dikes,t in,etc.): ` I <br /> Plan Approved by: Dater <br /> EH 23081(3/5/2012) <br />
The URL can be used to link to this page
Your browser does not support the video tag.