Laserfiche WebLink
ti <br /> 1.0 INTRODUCTION <br /> Mr. Les~Calkins has retained Park Environmental Corporation (Park) to prepare this work <br /> plan to address the'environmental issues at the facility located at 19825 North Highway 99 in <br /> Acampo, California (Figure 1). This work plan addresses the Total Petroleum�Hydrocarbon <br /> (TPH) oil contamination that was identified When the underground diesel fuel tanks were <br /> removed from the facility. <br /> R h , <br /> 1.1 Purpose of,Investigation <br /> The purpose of the work plan is to document some of the recent work that has been ongoing <br /> at the facility and to document the program that was conceptually agreed to at the March 31, <br /> 1993 meeting between Mr. Les Calkins and his representatives and Ms. Margaret Lagorio <br /> and Mr. Michael Collins of the San Joaquin Public Health Services, Environmental Health <br /> Division (PHS/EHD). <br /> 1.2 Proposed and Ongoing Scope-of Work <br /> • Document earlier ,testing (Sampling and'analysis completed); <br /> • Level and dry stockpiled soils (Verbal approval received 3131193 from PHS/EHD); <br /> • Spray tank excavation pit water onto the spread soil stockpile to dry (Verbal approval <br /> to proceed'ireceived 3131193 from PH'S/EHD); . <br /> o Empty 16 drums containing soil boring;cuttings and place on stockpile (Verbal <br /> approval to proceed received 3131193 from PHS/EHD); <br /> ` • Remove drums from area (Verbal approval to proceed received 3/31193 from <br /> PHS/EHD);' J; 1. „ <br />'i o Prepare Work Plan (This document); <br />' • Sample sidewalls and tank pit bottom; <br /> j ifi 4 T 1 <br /> • Analyze samples for TPH as gasoline and diesel, and BTEX; <br /> oPerform geotechnical evaluation to evaluate v ate the potential risks -that further excavation <br /> of the soil from the sidewalls and tank=pit bottom due to the:proximity:of an <br /> underground natural gas line within three feet of the east.pit sidewall, an above <br /> ground electrical utility pole within five feet.of the north.and east pit sidewall., and a <br /> building corner located approximately ten feet from the northeast corner,of the.pit <br /> sidewall; 1' <br /> 5003J1 r.l <br />