My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19501
>
2900 - Site Mitigation Program
>
PR0545628
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:14 PM
Creation date
4/28/2020 4:51:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545628
PE
3528
FACILITY_ID
FA0004738
FACILITY_NAME
LES CALKINS TRUCKING INC
STREET_NUMBER
19501
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
01321051
CURRENT_STATUS
02
SITE_LOCATION
19501 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TUN — 1 — TUE 1 336 GERR 'r N I 1-4 t-1 I I ham <br /> �• x x <br /> CONTROL <br /> Splits of all samples will be lagged for <br /> hydrologic character under the Unified Soil Classification and <br /> and tem <br /> U.S. Bureau of Mines rock color chart . A continuous geologic <br /> log of cuttings will be made as the come off <br /> a�sger . These logs will be plotted as graphic and descriptive the Soil ologs <br /> at a scale of 1 inch equal to !d feet . <br /> QUAL I T Y CONTROL <br /> All sampling equipment and tools will be decontaminated on <br /> site before each goring and rinsate contained in visqueen pends <br /> fOr evaporation or disposal . All sample collection devices will <br /> be steam Cleaned or washed in Tri Sodium Phosphate and double i <br /> rinsed in clean water . If there is vapor detectable levels of <br /> contamination in the rinsate the rinsate will be contained in DOT <br /> 55 gallon drums and manifested to a hazardous waste disposal <br /> facility , If no detectable contamination exists in the rinsate <br /> then the rinsate will be allowed to evaporate and the residue <br /> transported with the contaminated soil to a HWMU. <br /> Duplicate (bottom and middle tube in the spit spoon sample) <br /> samples will be taken at 10 foot depth in soil boring l and 15 <br /> foot depth in soil boring 2. In addition i trip blank will be run <br /> for every 20 samples (5-10 and one field blank before the last <br /> sample on every sampling day in which more than one boring is <br /> completed . This check sampling is in addition to the lab method <br /> blanks and surrogate sampling . <br /> MON1TOR WELL CONSTRUCTION <br /> Should sail borings be converted into monitoring wells they <br /> will he constructed in accordance with L,UET guidelines . The <br /> included diagrams show the specifics of typical well to be <br /> constructed in isolated or traffic areas. <br /> The monitoring wells will be used as piezometer and initial <br /> water sample collection wells unless a formal monitoring schedule <br /> is required . The screen intervals will be 15 feet unless <br /> cor}fining zones are encountered within the proposed screen <br /> interval . In this case screen intervals will be reduced to 5 feet <br /> with three feet being below and two feet above the water table . <br /> As with the soil borings the drill cuttings from the well <br /> construction will be screened with an OVA and containerized in <br /> DOT drtims for appropriate disposal later . <br /> PROJECT TIME FRAME <br /> rhe historical review should take about 1 day to complete . <br /> The first round of soil borings should be completed in two days <br /> if the borings are not converted to wells. <br /> 5 „ <br />
The URL can be used to link to this page
Your browser does not support the video tag.