My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19501
>
2900 - Site Mitigation Program
>
PR0545628
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:14 PM
Creation date
4/28/2020 4:51:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545628
PE
3528
FACILITY_ID
FA0004738
FACILITY_NAME
LES CALKINS TRUCKING INC
STREET_NUMBER
19501
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
01321051
CURRENT_STATUS
02
SITE_LOCATION
19501 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.71Jh1 — I.,5 - 92 -r UE i � ` -� GER R '-r Fa 11-4M I Ej.." I NC P . 14 <br /> t <br /> 1 <br /> �1 <br /> 1 <br /> If conversion to wells is necessary then three additional days <br /> should be allowed for each day in which a well is grouted . Sample <br /> analysis will take 14 days after the last sample is taken 'for <br /> completion. The entire proposal should take no more than thirty <br /> days from beginning to end . <br /> P1IAr-F IV REPORTING j <br /> A report containing the results of historic , geologic , <br /> hydrologic , chemical analysis and quality control and well <br /> development will be submitted to the client and to the County . <br /> This will include the consultants suggestions for further action <br /> toward remediation, if warranted , and well monitoring if <br /> necessary. 1 <br /> HEALTH AND SAFETY PLAN <br /> A . Material on site consist of diesels fuel and it 's <br /> components . (see table) <br /> B. Florescent streamers will be attached to poles 10 feet above <br /> site elevation on adjacent fence to indicate wind direction. <br /> C . All hazardous materials will t)e in highly diluted <br /> concentrations sorbed to soils and in gas phase. The NIOSH <br /> Guide to Chemical Hazards will be kept on site as a guide to <br /> the listed compounds for TWA, IDLH and LEI. levels . Any free <br /> product which might be found at the water table will be <br /> evaluated as outlined in the LUFT Manual . On site monitoring <br /> with explosimeter will be implemented when Organic Vapor <br /> Analyzer total exceeds 1000 ppm in any confined area . <br /> D. Site compounds known to cause cancer or reproductive <br /> abnormalities are highlighted on the list . <br /> E . Overhead utility service exists just outside the area of the <br /> work site . The power line will not conflict with the propose <br /> goring areas. U.S.A. Digs will mark any and all underground <br /> services. A natural gas and water line runs adjacent to the <br /> existing tank pit at the fence line. This area will be <br /> avoided . <br /> F . A Century 12B-GC Organic Vapor Analyzer will be on site <br /> and will be calibrated 3 times daily to zero area and 95 ppm <br /> methane gas. I <br /> G . Not applicable. <br /> H. Level 4 OSHA protection will be worn at the site . <br /> 6 <br /> { <br /> �i ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.