My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19501
>
2900 - Site Mitigation Program
>
PR0545628
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:14 PM
Creation date
4/28/2020 4:51:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545628
PE
3528
FACILITY_ID
FA0004738
FACILITY_NAME
LES CALKINS TRUCKING INC
STREET_NUMBER
19501
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
01321051
CURRENT_STATUS
02
SITE_LOCATION
19501 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T & T EARTH ►,, XVICES <br /> CP <br /> Tom Hunt Tim Smith <br /> r <br /> P.O. Box 1121 P.O. Box 1618 <br /> Jackson, CA 95642 Sutter Creek, CA 95685 <br /> T & T 1 (209) 223-2811 (209)267-0903 <br /> �',pTH SERYfCEs <br /> HEALTH AND SAFETY PLAN <br /> e <br /> A. Material on site consist of diesel fuel and it 's components. <br /> (See table) <br /> B. Florescent streamers will be attached to poles 10 feet above <br /> site elevation on adjacent fence. <br /> C. All hazardous materials will be in highly diluted <br /> concentrations sorbed to soils and in gas phase. The NIOSH <br /> Guide to Chemical Hazards will be kept on site as a guide to <br /> the listed compounds for TWA, IDLH and LEL levels. Any free <br /> product which might be found at the water table will be <br /> evaluated as outlined in the LUFT Manual . On site monitoring <br /> with explosimeter will be implemented when Organic Vapor <br /> Analyzer total exceeds 1000 ppm in any confined area . <br /> D. Site compound known to cause cancer or reproductive <br /> abnormalities are highlighted on the list . <br /> E. No overhead utility service exists in the area of the work <br /> site. U.S.A. Digs will mark any and all ; underground <br /> services. A natural gas and water line runs adjacent to the <br /> existing tank pit at the fence lime. This area will be <br /> avoided . <br /> F. C A Century 12B-GC Organic Vapor Analyzer will be on site <br /> and will be calibrated 3 times daily to zero area and 95 ppm <br /> methane gas. <br /> G. Not applicable. <br /> H. Level 4 OSHA protection will be worn at the site. <br /> I . A first aid kit will be on hand in all vehicles and a map <br /> showing the nearest hospital will be provided to all <br /> workers. <br /> J. Decontamination will consist of disassembling the drilling <br /> tools and steam cleaning of all tool parts. This will be <br /> completed after drilling of each new boring . Decontamination <br /> of sample collection devices will be done after each sample <br /> is collected . All sample collection devices will be washed <br /> in Tri Sodium Phosphate and double rinsed in clean water . <br /> K. Tom Hunt will be on site safety officer . (40 hour OSHA <br /> trained , contracting engineer and C-57 licensed . <br />
The URL can be used to link to this page
Your browser does not support the video tag.