Laserfiche WebLink
' 11 <br /> EMERGENCY PROCEDURES <br /> In the event of an emergency on site, the SSO Nvill direct the course of action It may be <br /> necessary for the SSO to depend on the other on-site personnel for assistance The SSO will call <br /> ' for emergency assistance if needed As soon as practical, the SSO will contact the PM and the <br /> HSD All staff assigned to this project will be briefed on the emergency procedures and their <br /> responsibilities for implementation A map showing the location and route to the hospital is <br /> included as Figure 2 The hospital can be reached by driving north on North Highway 99 frontage <br /> road from the site to northbound State Highway 99 at Armstrong Road Exit northbound Highway <br /> 99 and turn left (west) on State Highway 12, also known as Kettleman Lane Then turn right <br /> (north) on South Fairmont Avenue, approximately 2 miles west of the State Highway 99 Lodi <br /> Memorial Hospital is 1 mile on the left side, at the corner of South Fairmont Avenue and West <br /> Vine Street Follow the signs to the Emergency Room <br /> The SSO is trained in first aid and CPR A first aid kit and fire extinguisher will be located <br /> ' in the support vehicle The emergency shut-off switch for the drill ng will be identified, and during <br /> the site safety briefing all field personnel working in the area will be informed of its location and <br /> function The nearest telephone is located in the support The emergency telephone numbers to be <br /> used to call for assistance are listed in the section on Key Personnel and Responsibilities with the <br /> reference list of project contacts <br /> DOCUMENTATION <br /> The implementation of the SSHP must be documented to assure employee participation and <br />' protection In addition, the regulatory requirements must be met for record keeping on training, <br /> medical surveillance, injuries and illnesses, exposure monitoring, health risk information, and <br /> respirator fit-tests Documentation of each employee's activities is maintained by the HSD in <br />' Sacramento, California <br /> Documentation of the implementation of this plan will be accomplished using Attachments <br />' A through E Copies of these forms are included as Appendix B Attachment A must be completed <br /> by each BC employee at the initiation of field work for the project The site safety officer is <br /> responsible for ensuring that each BC employee has completed this form, and for submitting copies <br /> to the HSD The site safety officer is also responsible for completing the other attachments as <br /> required for a specific project Copies should be maintained in the project file <br /> E 1637RSSHP DOC <br />