Laserfiche WebLink
�v <br /> State Water Resources Control Board f <br /> Peter N1.Rooney John P.Caffrey,Chairman <br /> Pete Wilson <br /> Secretary forGovernor <br /> Division of Clean Water Programs,�, � � ,� r.,, <br /> Environmental 2014 T Street,Suite 130•Sacramento,California 95814•(916)22i�7887YAJ�(416)�127-4 30 12 <br /> Protection Mailing Address: P.O.Box 944212•Sacramento,California•94244-2120 <br /> Internet Address: httpa/www.swrcb.ca.gov/--cwphome/ustcf/fundhome.htm <br /> September 18, 1998 <br /> Moore Petroleum <br /> POBox 67 <br /> Banta, CA 95304 <br /> PRE-APPROVAL OF CORRECTIVE ACTION COSTS, CLAIM NO. 888 <br /> SITE ADDRESS. 14800 FRONTAGE RD W, MANTECA, CA 95336 <br /> I have reviewed your request for pre-approval of corrective action costs and will place these documents in your <br /> file for future reference. This pre-approval is specific to the activities as outlined in the June 5, 1998 proposal by <br /> Apex Envirotech,Inc. (Apex) for the replacement of an off-site domestic well which has leen impacted by <br /> contamination from the Moore Petroleum site. With the following provisions, the total cost pre-approved as <br /> eligible for reimbursement is $ 7,050, see the table below for a breakdown of costs. <br /> The Central Valley Regional Water Quality Control Board has concurred with the determination by San Joaquin <br /> County Environmental Health Division (SJCEHD) that no further action related to the underground storage tank <br /> release is required. Prior to site closure, it is necessary to install a new well to replace the impacted domestic <br /> well. <br /> Please be aware that this pre-approval does not constitute a decision on reimbursement: all reasonable and <br /> necessary corrective action costs for work directed and approved by the Regional Board will be eligible for <br /> reimbursement per the terms of your Letter of Commitment at costs consistent with those pre-approved in this <br /> letter. <br /> COST PRE-APPROVAL BREAKDOWN <br /> Task Amount Pre-Approved Comments <br /> Drill Well $5,980 Drill and case 6-inch well to 360 feet deep. <br /> Cost includes all materials and permitting. <br /> Install Well $1,070 Pull pump out of existing well and re-install <br /> in new well, trench 20 feet from old well to <br /> new well, install water lines and pvc <br /> conduit. <br /> TOTAL PRE-APPROVED $ 7,050 <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it to remain valid. <br /> + The work products must be acceptable to the Regional Board. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs on the new <br /> scope of work. <br /> • Although I have referred to the Apex proposal in my pre-approval above, please be aware that you will be <br /> entering into a private contract: the State of California cannot compel you to sign any specific contract. <br /> California Environmental Protection Agency <br /> Qa Recycled Paper <br />