Laserfiche WebLink
HIGHWAY 99 ON RAMP <br /> REMEDIATION <br /> MW-6 COMPOUND <br /> GRASS AREA + <br /> RW-2 <br /> RW-1 <br /> 0 BIRM MW-9 <br /> p� VB-3 <br /> LIGHT POLE <br /> err <br /> O MW-1 r' <br /> VB-4 <br /> � r <br /> 'fr I ' <br /> It <br /> rr f ''r EXISTING <br /> MW-5 ' <br /> MW-3 ►r' �if ire rrrr UNDERGROUND <br /> �. r STORAGE <br /> TANKS <br /> MW-4 <br /> r <br /> f CANOPY r <br /> r AND r <br /> r DISPENSER r 49 VB-2 <br /> r ISLANDS MW-7 <br /> r r <br /> r <br /> r <br /> r <br /> MW-2 �r <br /> . LIGHT POLE <br /> VB-1 <br /> BUILDING <br /> MW-8 ---- - - - -- - <br /> LEACH - <br /> 1 FIELD 1 - <br /> SEPTIC ; <br /> 1 1 TANK 1 LN <br /> LEGEND <br /> ACCESS ROAD DOMESTIC WELL: <br /> Monitoring Well <br /> DM-1 <br /> Re-Injection Well DM-2 N <br /> Proposed Soil Baring (Approx 100 ft) <br /> 0 40 80 71 <br /> Approximate <br /> Scale <br /> NOTE: SITE MAP TAKEN FROM MAP BY EMCON ASSOCIATES 1"=40' <br /> DRAWN BY: J.A. Rothgery PROPOSED SOIL BORING FIGURE <br /> ATE: 08/03/95 LOCATION.MAP <br /> REVISIONS 2 <br /> kr�� Moore Petroleum <br /> �N C. 14800 W. Frontage Road PROJECT <br /> M1M BER: <br /> Manteca, California ERA02.009 <br />