Laserfiche WebLink
r <br /> ETS ENVIRONMENTAL PROJECT 303 <br /> PAGE 3 <br /> .3. 0 SCHEDULE <br /> Werk or, this phase of the investigation can commerice <br /> immediately atter approval has been obtained from the :'Sara <br /> Joaquin Local Health District. <br /> It is anticipated that the field work can be completed <br /> within two working days. The report should be completed <br /> within 30 days after the field work has finished. This is <br /> based on a two to three week turnaround for the laboratory. <br /> 4. 0 ADDITIONAL INFORMATION <br /> A survey of underground utility lines was conducted. <br /> The lines have been located on the site pians. Underground <br /> Service Alert (USA) will be contacted prior to the <br /> commencement of any drilling operation. <br /> 5. 0 REMARKS AND SIGNATURES <br /> This workplan has been prepared using standard industry <br /> practices and represents our professional opinion as tb the <br /> arnount of work necessary to achieve the desired results. All <br /> work is to be conducted in a professional manner according to <br /> the protocol attached. � <br /> Prepared By: <br /> 7/2 <br /> Glen T White Date <br /> Project Geologist <br /> Reviewed and Ap roved y. 3 <br /> Dick Stratton Date <br /> General Manager <br /> �i <br />