My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
14800
>
3500 - Local Oversight Program
>
PR0545626
>
WORK PLANS_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:52:24 PM
Creation date
4/29/2020 1:33:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
CASE 1
RECORD_ID
PR0545626
PE
3528
FACILITY_ID
FA0000957
FACILITY_NAME
LATHROP GAS & FOOD MART*
STREET_NUMBER
14800
Direction
S
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
19702004
CURRENT_STATUS
02
SITE_LOCATION
14800 S HWY 99 RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMPLING PROTOCOL �I <br /> Fuge: i <br /> cuttings be incorporated into the soil treatment program and <br /> abandoned in place after treatment. i <br /> WELL CONSTRUCTION AND DEVELOPMENT E! <br /> All materials used in well construction will be <br /> thoroughly cleaned pricer to introduction into the boring. A <br /> bentonite or bentonite and cement slurry will be placed at <br /> the bottom of the boring as necessary. After the seal has <br /> been allowed to set enough to support the weight of the <br /> casing a E to G inch OD well casing (stainless steel or PVC) <br /> with and end cap, factory perforated for placement into the <br /> saturated zone, will be placed in the boring. The screen and <br /> filter pack sizes will be designed based upon sieve analysis <br /> data for samples as representative as possible of the '!water <br /> bearing formation. The casing and end caps will be threaded <br /> or .joined by stainless steel screws, no PVC cement will be <br /> used. The filter pack will extend two feet above ther <br />• perforated one. A seal of bentonite pellets one to t <br /> . two feet <br /> thick will be placed in the annular space above the -filter <br /> pack, followed by a bentonite or cement slurry to grade. All <br />` filter pack and well seals will be tremmied through the auger <br /> as necessary. <br /> A water-tight cap will be placed on top of the well <br /> casing inside a water-tight well box cemented into place. <br /> All wells will be labeled on the exterior of the well i:head <br /> containment structure with well type and identification <br /> number. On the interior, the label will contain well type, <br /> identification number, depth, and the perforation interval. <br /> Monitoring wells will be developed by airlifting with '! <br /> compressed nitrogen or pumped using suitable pumping <br /> equipment. <br /> SAMPLING <br /> All soil and groundwater samples will be properly <br /> labeled with project number, date collected, and sample <br /> identification number. All samples will be handled using <br /> standard chain of custody procedures. Field records will <br /> document the above information and other significant data, <br /> such as names of on-site personnel, sampling methods, slate <br /> and time of sampling, the number of well volumes removed <br /> before sampling, and any preservatives added or filtration <br /> performed on samples. <br /> The samples will be refrigerated and packaged <br /> immediately for delivery to the laboratory, and will under no <br /> circumstances be opened by anyone other than laboratory <br /> personnel. Chain of Custody records will be maintained at <br /> all times. <br />
The URL can be used to link to this page
Your browser does not support the video tag.