Laserfiche WebLink
4" Mr Jerry Moore Project 2520-100 01 <br /> July 27, 1994 <br /> Page 3 <br /> If you have any questions, please call <br /> S>nc,erely, t0tcD <br /> EMCPN Associate J IAN c ISH Id <br /> / <br /> NO 1321 <br /> FED <br /> ENGINEERING <br /> Harold R DukeJ Isham `nom GEQtaSISx Q <br /> Project Manager G ology Manage9rtt' CAit��Q�� <br /> E G 1321 <br /> Attachments Table l Groundwater Elevation Data <br /> Table 2 Groundwater Analytical Results <br /> Figure 1 Site Location Map <br /> Figure 2 Groundwater Contour Map, May 16, 1994 <br /> Figure 3 Benzene Concentration Map, May 16, 1994 <br /> Appendix A Sampling and Analysis Procedures <br /> Appendix B Certified Analytical Results and <br /> Chain-of-Custody Records <br /> {� cc, Margaret Lagono, San Joaquin Public Health Ser-vices/Environmental Health <br /> Division <br /> Barry Newman, Central Valley Regional Water Quality Control Board <br /> SACIPJ2\2520\25201000 las 94 pas 3 <br />