My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012730
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
14800
>
3500 - Local Oversight Program
>
PR0545626
>
ARCHIVED REPORTS_XR0012730
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:34 PM
Creation date
4/29/2020 2:42:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012730
RECORD_ID
PR0545626
PE
3528
FACILITY_ID
FA0000957
FACILITY_NAME
LATHROP GAS & FOOD MART*
STREET_NUMBER
14800
Direction
S
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
19702004
CURRENT_STATUS
02
SITE_LOCATION
14800 S HWY 99 RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
598
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4` <br /> PkOBLEM ASSESSMENT REPORT <br /> ' Moore Petrotem, Inc. <br /> 14800 W. Frontage Road, Manteca, CA <br /> NGA Project No. 1C•90.479 <br /> Page 5 <br /> bentanite seal was placed above thu filter pack using bentonite <br /> Pellets. The annular space above the bentonite was filled with a <br /> cement-bentonite grout which extended to ground surface. Each <br /> monitoring well was completed inside a steel cristy box. <br /> Monitoring well construction details are presented on the soil <br /> boring logs shown in Appendix A. <br /> In order to remove natural aquifer fines and drill cuttings from <br /> the vicinity of the well screen, each monitoring well was developed <br /> A following construction by hand bailing. subsequent to initial well <br /> development-, several of the monitoring wells have been re--developed <br /> in order tc. increase well efficiency and reduce the turbidity of <br /> €. ground-water .-,,samples collected from the monitoring wells, <br /> Development wa`er has been stored on-site in . 55-gallon, drums. <br /> f . Table 2 presents available well development infoxnation for all <br /> wells at the site. <br /> i <br /> TABLE 2 <br /> Well Development Information <br /> G Volume of Developed Water <br /> r 1_1 D. Date (gallons) <br /> MW-3 5/11/89 40 <br /> 07/06/90 5 <br /> MW-4 5/11/89 5 <br /> 07/06/90 10 <br /> f� MW-5 12/89 16 <br /> 07/06/90 10 <br /> i ' <br /> irq MW-6 12/89 16 <br /> 07/06/90 40 <br /> i <br /> t-. <br /> MFT-7 12/89 16 <br /> 07/06/90 10 <br /> MW-8 12/89 16 <br /> 07/06/90 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.