My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012730
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
14800
>
3500 - Local Oversight Program
>
PR0545626
>
ARCHIVED REPORTS_XR0012730
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:34 PM
Creation date
4/29/2020 2:42:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012730
RECORD_ID
PR0545626
PE
3528
FACILITY_ID
FA0000957
FACILITY_NAME
LATHROP GAS & FOOD MART*
STREET_NUMBER
14800
Direction
S
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
19702004
CURRENT_STATUS
02
SITE_LOCATION
14800 S HWY 99 RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
598
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a� <br /> wr <br /> _. PROBLEM ASSESSMENT REPORT <br /> Moore PetroEem, Inc. <br /> 14800 W. Frontage Road, Hantera, CA <br /> HGA Project No. 10.90-479 <br /> Page 18 <br /> via a small blower through a 350-gallon tank to remove <br /> hydrocarbons. The 350-gallon tank would allow about 90 minutes <br /> resident time with a combined pumping rate of 4 gpm. <br /> Effluent ground water from the bubbling tank would be injected via <br /> monitoring well MW-6, prior to re-injection ground water will be <br /> sampled and analyzed for BTEX, EDB, EDC, and. TPH. Should sampling <br /> show that a 90 minute resident time is not sufficient for complete <br /> removal of petroleum constituents, a second 350-gallon tank will <br /> be connected in series to the first tank to increase the efficiency <br /> of the air bubbler system. Sufficient sampling of the air bubbler <br /> system will be accomplished to ensure that ground water containing <br /> }petroleum constituents will not be injected via MW-6. <br /> 6.0 RECOMENDATYONS <br /> Based on the results of this Problem Assessment Report, NGA <br /> recommends completion of the following tasks. <br /> l e <br /> ® Submittal of an application fora permit:' to construct <br /> and operate the soil venting system proposed in Section <br /> } <br /> 5.1, to the San Joaquin Air Quality Management <br /> "j District. <br /> • Following issuance of a permit to construct and operate <br /> ..f the soil venting system, implement the proposed soil <br /> venting system. <br /> s Implement the ground-water remediation alternative <br /> '` described as scenario 2 in Section 5.2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.