Laserfiche WebLink
Revise on site plan max number of employee for the septic, and incorporate findings fo SSS <br /> Construct well and septic <br /> Refuse cleanup <br /> 2005/5/9 Engineered Design Septic by Warren D. Doug Noteware, PE: 2X 2000g tank to 10x100' LL <br /> for both bathroom (bathhouse) and Clubhouse with Grease Trap at Clubhouse. <br /> 2005/7/29 EHD approved septic design. <br /> 2007/6/20 EHD signed off bldg. permit for bathroom; EHD signed off on Cert of Occupancy for PA- <br /> 0300581 boat dock - - <br /> 2010 PA1000010(SA)SO0008087: Expansion of private water ski lake in 3 phases: <br /> Phase 1: 3400 sq ft restroom +storage building (by existing picnic Clubhouse area) <br /> Phase 2: 5000 sq ft Lounge+ Hospitality room in 3 years(by existing picnic Clubhouse area) <br /> Phase 3:,7,200 sq ft office, RR, storage, concession building in 5 years (by Little League Diamond) <br /> east of Water Ski Lake -- <br /> Cited on 2 employee on PA application <br /> 2010/Feb/23 EHD PA1000010(SA)S00008087: <br /> Addendum to SSS/NLS to incorporate proposed expansion to existing water ski facility <br /> SPWS if number over 24 for at least 60 days per year <br /> Construct septic <br /> Provide Food Plans <br /> 2010/10/6 EHD (Rodney) released Plan for Phase 1 only, restricting Phase 2 and 3, requiring <br /> addendum to NLS/SSS <br /> 2012/5/2 Warren Noteware (PE) calculated septic requirement for Phase 1 only using 50 members <br /> @ 15 gal/day 750 gpd: btc 1200 g tank+750 gpd = 1950 g: 2000 gallon tank+4 x 100' LL <br /> 2012/5/9 Septic system for Phase 1 installed SR0064863 <br /> 2016 PA1000010(SA)(RAA), S00011070, revision: <br /> Extend Phase 2 from 3 years to 11 years <br /> Phase 1 to include 3,400 sq foot restroom and storage (same as before) <br /> Phase 2: 5000 sq ft Lounge+ Hospitality room (same) <br /> Phase 3 to include 7,200 sq foot office, RR, storage, concession building(same) <br />