Laserfiche WebLink
Comments: <br /> Routine waste tire inspection done on this date and the following was noted: <br /> No violations or areas of concern. <br /> Notes: <br /> 1.) Permission to conduct inspection was granted by Wes Hieb (Plant Manager). <br /> 2.) TPID certificate is posted in the hall way of the office. <br /> 3.) No waste tires observed on site. <br /> 4.)A search done on WTMS resulted in 9 manifest. 3 of the 9 manifests were on site and available for review <br /> during the inspection. The other 6 manifests were emailed. <br /> 5.) Retain all waste tire logs, receipts, and manifests for 3 years. <br /> 6.) Facility does not store its waste tires at this location. Facility uses "McCoy's Industrial Tire, Inc."for tire <br /> services and disposal of waste tires. Waste tires are usually hauled out when services are done. <br /> 7.) Inspection report emailed to wesh@herricksteel.com. <br /> FILE COPY <br />