Laserfiche WebLink
STATE OF CALIFORNIA STATE OF CALIFORNIA VOLTAGE DROP CALCULATION (208/120V SYSTEM) _ <br /> Electrical Power Distribution Electrical Power Distribution BRANCH CIRCUIT: 3% MAX <br /> CEC-NRCC-ELC-01-E(Revised 01/16) CALIFORNIA ENERGY COMMISSION CEC-NRCC-ELC-01-E(Revised 01/16) CALIFORNIA ENERGY COMMISSION <br /> CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E LOAD PER MAXIMIM SIZE GROUND WIRE MAXIMUM LENGTH OF BRANCH CIRCUIT PER NOTES AND <br /> Electrical Power Distribution Page 1 of 4 Electrical Power Distribution Page 2 of 4 PHASE CB WIRE SIZE SIZE UTILIZATION VOLTAGE REMAR S <br /> Project Name: Date Prepared: Project Name: Date Prepared: <br /> STARBUCKS @ MARCH AND WEST 12/09/2019 STARBUCKS @ MARCH AND WEST 12/09/2019 (KVA) (A) (AWG) (AWG) (120V,1 PH) (208V,1 PH) (208V,3PH) <br /> General Information B.Separation of Electrical Circuits for Electrical Energy Monitoring <1.92 20 #12 #12 56 FT. 85 FT. 98 FT. A <br /> Project Address: Climate Zone: Conditioned Floor Area: Check all boxes below if the electrical power distribution system is in compliance with Section 130.5(b). #10 #10 94 FT. 141 FT. 163 FT. A <br /> 1,589 The electrical power distribution system meets the separation of electrical circuits for electrical energy monitoring requirement of Section #8 #8 144 FT 217 FT. 250 FT. A <br /> 5010 WEST LANE,STOCKTON,CA 95120 12 Unconditioned Floor Area: p y g energy g types #6 #6 230 FT. 345 FT. 398 FT A <br /> ❑ 130.5(b).The electrical ower distribution systems is designed so that measurement devices can monitor the electrical ener usage of load t es <br /> according to TABLE 130.5-B. <br /> Building Type: ✓ Nonresidential High-Rise Residential Hotel/Motel <1.44 20 #12 #12 75 FT. 113 FT. 130 FT. A <br /> ❑ ❑ g ❑ 02011 STARBUCKS COFFEE COMPANY <br /> ❑ Describe the electrical power distribution system installed and the compliance method chosen in meeting the requirement of Section 130.5(b). #10 #10 125 FT. 188 FT. 217 FT. A <br /> ❑Schools ❑ Relocatable Public Schools ❑✓ Conditioned Spaces ❑ Unconditioned Spaces Use the space below to include the information.Examples of compliance methods are detailed in Nonresidential Compliance Manual Chapter 8. <br /> #8 #8 192 FT 289 FT. 334 FT A <br /> Phase of Construction: E] New Construction ❑ Addition ZAlteration Fill out Column 1 thru 3 with the compliance information. STARBUCKS COFFEE <br /> Electrical Power Distribution System information Electrical Service Enforcement #6 #6 306 FT. 460 FT. 531 FT. A COMPANY <br /> General Information and Method of compliance Rating Agency <1.26 20 #12 #12 86 FT. 129 FT. 149 FT. <br /> In the table below identify all applicable construction documents that specify the requirements for the scope of responsibility reported 01 02 03 04 #10 #10 143 FT. 215 FT. 248 FT. 2401 UTAH AVENUE SOUTH <br /> by this certificate. Use additional pages as needed to list all construction documents related to compliance of Section 130.5. SEATTLE, WASHINGTON 98134 <br /> Electrical Service Describe the electrical power distribution system kVA Check that the #8 #8 220 FT 330 FT. 381 FT. <br /> Document Title/Descriptions Indicate which subsection of Designation/Location/Description installed and the compliance method used system complies <1.08 20 #12 #12 100 FT. 150 FT. 173 FT. (206) 318-1575 <br /> (include description information for Document Sheet#or Section 130.5 is related to the EXISTING PANEL"B" EXISTING PANEL"B" 58.36 <br /> Document Number 120/208V,3PH,4W,400A 58.36KVA #10 #10 167 FT. 250 FT. 289 FT. THESE DRAWINGS AND SPECIFICATIONS ARE <br /> Table or Schedule if it contains Page# document(e.g. 130.5(a)for CONFIDENTIAL AND SHALL REMAIN THE SOLE <br /> compliance information) service electrical metering) #8 #8 256 FT 385 FT. 445 FT. PROPERTY OF STARBUCKS CORPORATION, <br /> EXISTING PANEL"C" EXISTING PANEL"C"FED FROM PANEL"B" <br /> 1zo/zo8v,3PH,4W,125A 26.21KVA <0.9 20 #12 #12 120 FT. 180 FT. 208 FT. WHICH IS THE OWNER OF THE COPYRIGHT IN THIS <br /> N/A SINGLE LINE DIAGRAM E-601 WORK. THEY SHALL NOT BE REPRODUCED(IN <br /> #10 #10 200 FT. 300 FT. 347 FT. WHOLE OR IN PART),SHARED WITH THIRD <br /> Add Row Remove Last <0.72 20 #12 #12 150 FT. 225 FT. 260 FT. PARTIES OR USED IN ANY MANNER ON OTHER <br /> PROJECTS OR EXTENSIONS TO THIS PROJECT <br /> #10 #10 250 FT. 376 FT. 434 FT. WITHOUT THE PRIOR WRITTEN CONSENT OF <br /> A.Service Electrical Metering STARBUCKS CORPORATION. THESE DRAWINGS <br /> Check one of the three boxes below if the electrical power distribution system is in compliance with Section 130.5(a). AND SPECIFICATIONS ARE INTENDED TO EXPRESS <br /> For newly installed electrical service in newly constructed buildings,Service Electrical Metering is required according to Section 130.5(a).Fill out 1. CONTRACTOR SHALL FEFER TO THIS TABLE PRIOR TO START OF BRANCH CIRCUIT ROUGH-1 N. DESIGN INTENT FOR A PROTOTYPICAL <br /> STARBUCKS STORE(WHICH IS SUBJECT TO <br /> Column 1 through 6 o table below. ❑ 2. CONTRACTOR SHALL USE THE APPROPRIATE WIRE SIZE IN CONJUNCTION WITH THE LENGTH OF THE PROPOSED CHANGE AT ANYTIME)AND DO NOT REFLECT <br /> For new or replacement electrical service equipment in existing buildings,Service Electrical Metering is required according to Section 141.0(b)2Pi. FIELD VERIFIED ROUTING OF BRANCH CI RCUIT WI RI NG(INCLUDING VERTICAL& LATERAL RUN, ROUTED ACTUAL SITE CONDITIONS. NEITHER PARTY SHALL <br /> � Fill out Column 1 through 6 o table below. HAVE ANY OBLIGATION NOR LIABILITY TO THE <br /> PARALLEL/ PERPENDICULAR TO THE BUILDING STRUCTURE. OTHER(EXCEPT STATED ABOVE)UNTIL A <br /> ❑ EXCEPTION to Electrical Service Metering:Service or feeder for which the utility company provides a metering system that indicates instantaneous SEE PANEL SCHEDULE FOR THE CORRESPONDING KVA LOAD PER PHASE OF A PARTICULAR BRANCH CIRCUIT. WRITTEN AGREEMENT IS FULLY EXECUTED BY <br /> kW demand and kWh for a utility-defined period.Fill out Column 1,2 and 6 of table below with the compliance information. BOTH PARTIES. <br /> 4. RESISTANCE VALUES ARE FOR UNCOATED COPPER WIRES IN STEEL CONDUIT, 75 DEGREE C., OPERATING AT 60 HZ. <br /> Fill out a separate line for each electrical service that is connected to the building. <br /> Electrical Exception to ARCHITECT OF RECORD <br /> Electrical Service Schedule Service Rating Metering Capabilities(check all that are present) 130.5(a) Field Inspector NOTES: o -C a, W <br /> N <br /> 01 02 03 04 05 06 oz 08 A = THE VALUES IN "120V, 1PH" COLUMN IS TO BE USE FOR GENERAL PURPOSE RECEPTACLE LOADS. � > o <br /> a <br /> U <br /> c Olt <br /> c� <br /> Tracking kWh Field Inspector Notes: <br /> Instantaneous Check that the p <br /> Electrical Service Designation/ Historical for a user- kWh per Utility metering <br /> kVA (at the time) metering <br /> Location/Description kW peak(kW) definable rate period system complies <br /> period mcg architecure <br /> 111 Pacifica,Suite 280, Irvine,CA 92618 <br /> P:949.553.1117 F:949.474.7056 <br /> FIRST FLOOR 58.36 ❑ ❑ ❑ ® ❑ ❑ <br /> �rjFES <br /> Add Row Remove Last <br /> ACIES <br /> rrroQRpFESSip,Vq ttlt <br /> ENGINEERING rh��h�\SLAV 1 Cv'Fc221jj <br /> 3371 Olcott Street <br /> Santa Clara,CA 95054 1 15130 z <br /> ph:(408)522-5255 1 E'D = 4 1 <br /> fx:(408)522-5260 rti p� Q rrr <br /> info acies.netttz q2�FCTR�G <br /> CA Building Energy Efficiency Standards-2016 Nonresidential Compliance January 2016 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance January 2016 Copyr ght©2019 tttt 1 OFti A01 <br /> STATE OF CALIFORNIA STATE OF CALIFORNIA <br /> Electrical Power Distribution Electrical Power Distribution <br /> CEC-NRCC-ELC-01-E(Revised 01/16) CALIFORNIA ENERGY COMMISSION CEC-NRCC-ELC-01-E(Revised 01/16) CALIFORNIA ENERGY COMMISSION <br /> CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E <br /> Electrical Power Distribution Page 3 of 4 Electrical Power Distribution Page 4 of 4 <br /> Project Name: STARBUCKS @ MARCH AND WEST Date Prepared: 12/09/2019 Project Name. STARBUCKS @ MARCH AND WEST Date Prepared: 12/09/2019 <br /> C.Voltage Drop Enforcement Agency DOCUMENTATION AUTHOR'S DECLARATION STATEMENT <br /> Check all boxes below if he electrical power distribution system is in compliance with Section 130.5(c). Check that the system 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. <br /> complies Documentation Author NameTOMISLAV Z. GAJIC Documentation Author Signature: <br /> ❑✓ O <br /> The electrical power distribution system meets the voltage drop requirement of Section 130.5(c).The Company ACIES ENGINEERING signature Date:12/09/2019 <br /> r <br /> maximum combined voltage drop on feeder conductors and branch circuit conductors to the farthest ❑ Address: CEA/HERS Certification Identification(if applicable): N <br /> connected load or outlet,do not exceed 5%. 3371 OLCOTT STREET L0 <br /> city/state/ZipSANTA CLARA, CA 95054 Phone:(408)522-5255 L <br /> ❑✓ Voltage drop calculation documents showing compliance to Section 130.5(c)are submitted as part of the RESPONSIBLE PERSON'S DECLARATION STATEMENT Z Q <br /> compliance document submittal. ❑ I certify the following under penalty of perjury,under the laws of the State of California: (n Q U <br /> 1. The information provided on this Certificate of Compliance is true and correct. 06 W <br /> 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified W 0Z <br /> on this Certificate of Compliance(responsible designer). Q = 0 W O <br /> 3. The energy features and performance specifications,materials,components,and manufactured devices for the building design or system w <br /> D.Circuit Controls for 120-Volt Receptacles and Controlled Receptacles U <br /> Field Inspector design identified on this Certificate of Compliance conform to the requirements of Title 24,Part 1 and Part 6 of the California Code of Z Q <br /> Check one or more boxes below for applicable requirements of Section 130.5(d)for the electrical power Check that the system Regulations. W W <br /> distribution system. complies <br /> 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information � � O <br /> The control is capable of automatically shutting OFF the controlled receptacles when the space is typically provided on other applicable compliance documents,worksheets,calculations,plans and specifications submitted to the enforcement 0 < O <br /> unoccupied,either at the receptacle or circuit level.For the automatic time switch control,it incorporates an agency for approval with this building permit application. G � '^ <br /> override control that allows the controlled receptacle to remain ON for no more than 2 hours when an 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s)issued for the G U) <br /> override is initiated and an automatic holiday"shut-OFF"feature that turns OFF all loads for at least 24 hours ❑ building,and made available to the enforcement agency for all applicable inspections.I understand that a completed signed copy of this <br /> and then resumes the normally scheduled operation.Countdown timer switches are not be used to comply Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. STORE #: 13402 <br /> with the automatic time switch control requirements.The controls meet the requirement of Section 130.5(d)1. Responsible Designer Name TOMISLAV Z. GAJIC Responsible Designer Signature: PROJECT #: 39714-051 <br /> company' Date Signed.12/09/2019 <br /> There is at least one controlled receptacle within 6 ft from each uncontrolled receptacle.Where receptacles CASEWORK CONCEPT: CORE <br /> are installed in modular furniture in open office area,at least one controlled receptacle is installed at each ❑ Address:3371 OLCOTT STREET License:E15130 ISSUE DATE: <br /> workstation.The receptacles meet the requirement of Section 130.5(d)2. city/state/Zip SANTA CLARA, CA 95054 Phone:(408)522-5255 PROGRAM MANAGER: M. DREBIKA <br /> There are installed split wired receptacles with at least one controlled and one uncontrolled receptacle. STORE DESIGNER: S. BELVINS <br /> Where receptacles are installed in modular furniture in open office area,at least one controlled receptacle is ❑ LEED(D AP: N/A <br /> installed at each workstation.The receptacles meet the requirement of Section 130.5(d)2. CHECKED BY: <br /> ® Permanent and durable marking for controlled receptacles or circuits to differentiate them from uncontrolled ACIES PROJECT M 190480 <br /> receptacles or circuits is provided.The markings meet the requirement of Section 130.5(d)3. ❑ ACIES DESIGNER BY: HT <br /> ❑ For hotel and motel guest rooms,there are controlled receptacles for at least one-half of the 120-volt ACIES CHECKED BY: TG <br /> receptacles in each guest room.Electric circuits serving controlled receptacles in guestrooms are installed to <br /> have captive key controls,occupancy sensing controls,or automatic controls so the power is switched off no ❑ Revision Schedule <br /> longer than 30 minutes after the guest room has been vacated.The receptacles meet the requirement of <br /> Section 130.5(d)4. Rev Date By Description <br /> ❑ Receptacles that are only for the following purposes are excepted from Section 130.5(d): <br /> Receptacles specifically for refrigerators and water dispensers in kitchen areas. <br /> Receptacles located a minimum of six ft above the floor that are specifically for clocks. <br /> Receptacles for network copiers,fax machines,A/V and data equipment other than personal computers in ❑ <br /> copy rooms. <br /> Receptacles on circuits rated more than 20 amperes. SHEET TITLE: <br /> Receptacles connected to an uninterruptible power supply(UPS)that are intended to be in continuous ELECTRICAL POWER <br /> use,24 hours per day/365 days per year,and are marked to differentiate them from other uncontrolled <br /> receptacles or circuits. DISTRIBUTION FORMS <br /> SCALE: AS SHOWN <br /> SHEET NUMBER: <br /> CA Building Energy Efficiency Standards-2016 Nonresidential Compliance January 2016 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance January 2016 <br /> E-006 <br />