My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10217
>
3000 – Underground Injection Control Program
>
PR0523720
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:56:07 PM
Creation date
4/30/2020 11:09:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0523720
PE
3020
FACILITY_ID
FA0015999
FACILITY_NAME
RENTAL UNITS
STREET_NUMBER
10217
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
12204013
CURRENT_STATUS
01
SITE_LOCATION
10217 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02/07/2005 15:52 20995100' CHAMPAGNE PAGE 05 <br /> FROM Ground Zero Analysis PHONE NO. 209 838 988.3 Feb. 07 2005 04:10PM P2 <br /> GROUND ZERO ANALYSIS, INC. <br /> 1711 M@W strec <br /> Esca m,cadfimi. 95320-1927 �r� - <br /> T�bo�es OW @36-9M ���+` <br /> acaTas�:(�8C�8.9aas l.% U <br /> CIO <br /> February 7,2005 ��,,I <br /> -'�- r(" <br /> Mrs. Sharon Souser 1 <br /> 6333 Pacific Avenue,#283 <br /> Stockton,CA 95207 <br /> slibje ct: Cost Estimate for Soil Sampft and Coatnaftu ion 1(t vataation <br /> Dew Mrs. Sousa: <br /> As requested we are writing to provide you with a preliminary cost estimate for sampling and an <br /> evaluation of contamination of the soil beneath the septic tank, the distribution box, and one of the <br /> seepage pits. the proposed work is anticipated to provide you with an indication of the magnitude <br /> of any contamination in the soil below the septic tank. <br /> 77he proposed analyses are those that have been required by San Joaquin County Enviro=wntal <br /> Health Department,Site TvCtigation Unit(EHD). in their letter dated January 25.2005. <br /> Our cost estimate is based on the following scope of work- <br /> Ad <br /> ork: �- <br /> Advance�borings atthe subject site. One boring will be advanced below the distribution <br /> box to a depth of 4 feet. One boring will be advanced below the septic tank to a total depth of <br /> 12 feet. The final boring will be advanced through arse of the seepage pits to a total depth of 27 <br /> feet. Keep in mind that EHD may require that samples be collected at each of the seepage pits, <br /> however, post o y sampling one, <br /> Soil samples will be collected at 3-foot intervals(in the deeper borinp) for soil classification <br /> and possible anwalysis. A soil sample will also be collected from the bottom of each boring. <br /> a Subzmit the samples to appropriate laboratories for the analyses required by EHD in their letter <br /> and prepare a report ging the tesults. <br /> The ost mated coat for the proposed scope of work is S 3,227.!10. Exhibit A, amohed, provides <br /> more detail on the estimated costs associated A ith the workscope. <br /> If you wish us to proceed with the wodc aid if this coat estimate is acceptable please sign in the <br />
The URL can be used to link to this page
Your browser does not support the video tag.