Laserfiche WebLink
ENVIRO ENTAL HEALTH EPARTMENT <br /> ` OPOU!N ? <br /> C <br /> - SAN JOAQUIN COUNTY <br /> s: Program Coordinators <br /> Q: Donna K. Heran, R.E.H.S. <br /> Director 304 East Weber Avenue,Third Floor Carl Borgman,R.E.H.S. <br /> ' Laurie A. Cotulla,R.E.H.S. Stockton,California 95202-2708 Mike Huggins,R.E.H.S.,R.D.I. <br /> cq �° Margaret Lagorio,R.E.H.S.. a Assistant Director Telephone:(209)468-3420 <br /> o <br /> Robert McClellon,R.E.H.S. <br /> Fax: (209)464-0138 Jeff Carruesco,R.E.H.S. <br /> September 22,2006 Website:www.sjgov.org/ehd/ Kasey Foley,R.E.H.S. <br /> Marty Weithman <br /> Service Station Systems,Inc. <br /> 680 Quinn Ave <br /> San Jose,CA 95112 <br /> Fax: (408)213-6026 <br /> Re: Arco#6020 <br /> 1711 E.Yosemite Ave <br /> Manteca,CA 95336 <br /> The San Joaquin County Environmental Health Department(SJCEHD)has reviewed and approved <br /> the permit to replace unleaded(87)tank fill spill bucket at the above referenced location. The permit <br /> has been approved with the following conditions: <br /> 1. Contact the local fire department,and the San Joaquin Valley Air Pollution Control District <br /> for applicable permits and requirements. <br /> 2. Any changes in information or scope of work must be submitted to SJCEHD prior to <br /> commencing work. All new addendums supercede the previous ones. <br /> 3. At least one person who holds the International Code Council(ICC) UST Service <br /> Technician"certification and manufacturers' certificate of training for 11 components <br /> installed or tested must be onsite at all times when work is performed. <br /> 4. Each person installing or testing any component must hold a certificate of training from the <br /> manufacturer of that component. <br /> 5. The"Certificate of Compliance for Underground Storage Tank Installation Form C"shall be <br /> submitted by the owner or the owners' agent[pursuant to California Code of Regulations <br /> (CCR)2635 (d)]before this upgrade will be considered complete by SJCEHD. <br /> 6. If concrete is broken above the tank pit,a tank integrity test must be performed by a certified <br /> tank tester and results received by this office within 7 days of completion of work. <br /> 7. Contact Toua Yang at(209)468-3459 to arrange the following inspection appointment(s); <br /> a 48-hour notice for inspection appointment(s)is required. <br /> a. Spill bucket: verify minimum 5-gallon capacity and pass a 60-minute lake test or <br /> equivalent. Proper drainage must also be verified. <br /> 8. Permit expires 90 days from the approval date. Note: if an extension to the expiration date is <br /> required,a written request must be submitted to this office prior to the expiration date. <br /> Thank you, <br /> Toua Yang,EHS <br /> Environmental Health Specialist <br />