My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004 - 2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2020 12:14:14 PM
Creation date
5/1/2020 9:04:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Board&Software Replacement Before Turning Off Power-All Procedures <br /> A Remove the grounding wrist strap from <br /> aL] its package and wrap one end around <br /> `- your wrist. Ahere the other end to the <br /> side of the comm board cage. <br /> Pivot edge of tool <br /> against inner partition <br /> of console. <br /> �Ies\cvuDaoui.evs CPU Board <br /> 4 Place curved end of the removal <br /> tool under front end of CPU board at <br /> each retention pin location(3 places) <br /> 0 <br /> O and rotate tool to pry the board <br /> off of the retention pin. Replace <br /> —F removal tool in its storage position. <br /> CPU Board Installation guide o C=3 1p <br /> slots(one at top and bottom) . o 0 <br /> « o <br /> 0 <br /> 3 Retrieve Board Removal • <br /> tool from its storage <br /> position on the top of the Pull the board straight out until you disconnect <br /> comm cage by pulling on a it from the motherboard connector and it <br /> black knob in center of clears the top and bottom guides. Rotate it <br /> tool. towards you to clear the door. Hold the CPU <br /> 1 — l board by its edges and avoid touching <br /> �J components and connector pins. <br /> 5 Disconnect each of the two cables $m q <br /> attached to the CPU board,and the <br /> printer cable from the Local Printer ° .. <br /> Com Board. <br /> Remove ac power to the ® �� <br /> console. Push S2 down to <br /> — turn battery backup OFF. ° <br /> a ATT OPEN <br /> Figure 2. Removing CPU Board <br /> 5. Place old and new CPU boards side by side on a clean work surface. Make sure the Battery Backup switches on <br /> ® both boards are in the Off position. Remove the SEM(see Figure 17 on page 29)and the PROM chips(see page <br /> 17)from the old CPU board and plug them into the identical sockets on the new CPU board. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.