My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004 - 2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2020 12:14:14 PM
Creation date
5/1/2020 9:04:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 7 <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: ❑Tank Manufacturer 0 Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ® Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: DIAL GAUGE Equipment Resolution: 0 to 15" Hg Vacuum <br /> Tank# 7 Tank# ` Tank# Tank# <br /> 71sTank Exempt From Testing?' ❑Yes ❑No ❑Yes ❑No ❑ Yes ❑ No ❑ Yes ❑No <br /> Capacity: 1S. GALLONS 1�,` GALLONS 11- GALLONS GALLONS <br /> Tank Material: <br /> Tank Manufacturer: <br /> Product Stored: <br /> Wait time between applying <br /> pressurelvacuum/water and 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(RD: j L' " HG JO "HG /D "HG "HG <br /> Test End Time: 0 i 3 /9�1.30 <br /> Final Reading(RF): j "HG /v "HG l0 " HG "HG <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-RI): i "HG "HG "HG " HG <br /> Pass/Fail Threshold or Criteria: Zero Zero Zero Zero <br /> Tesf Result: �:u =' KP.ass :❑Fail hail l Pass Fail <br /> :.. ._ El ❑Fail Pass [I <br /> Was sensor removed for testing? ❑ Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No L1 NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for fulled tests) <br /> Arco # 6020 <br /> 1711 E. Yosemite Ave. <br /> Manteca, CA. 95336 <br /> N05116 — SB 989 Testing — <br /> 'Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. {California Code of Regulations,Title 23,Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.