Laserfiche WebLink
, w <br /> SW RCB.,lanuary 2002 h`Lc <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: <br /> Spill/Overfill Containment BOxCS are Present,but were Not Tested: <br /> Test Method Developed By: F� Spill Bucket Manufacturer Efl Industry Standard El 1'roiessional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: 1-1 Pressure Vacuum Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Equipment Res lution: <br /> Spill Box N 1 UNL FILL Spill Box H Spill Box 9 Spill Box# <br /> Bucket Diameter: 10 <br /> Bucket Depth: 13 <br /> Wait time between applying <br /> pressure/vacuum/water and 5 <br /> starting test: <br /> Test Start Time: 1400 <br /> Initial Reading(Rt ): 9 <br /> Test End Time: 1500 <br /> Final Reading(RF ): 9 <br /> Test Duration: 60 MINS. <br /> Change in Reading(R F- IZi ) 0 <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: Z Pass El Fail Pass E Fail D Pass 1:1 Fail E]Pass 1:1 Fail <br /> Comments - (include information on repairs mode,hrior to testing, and recommended follotir-acp fa•Juiled tests) <br />