Laserfiche WebLink
Flush-Mounted Well Vault <br /> 0 Ground Surface <br /> \ /\� Concrete(2-foot minimum) <br /> 20 <br /> D <br /> D <br /> 40-. P 6-5/8" Dia. Borehole <br /> Grout Seal <br /> 60 <br /> D. <br /> a� <br /> 2"Solid PVC Pipe <br /> U <br /> N 80 <br /> .0 <br /> C <br /> 7 <br /> O - <br /> 100 <br /> s �( <br /> I- <br /> 5� 1 <br /> W 120 9 <br /> 140 9. <br /> 160 J V�. � g <br /> Bentonite Seal (2-foot minimum)— <br /> 180 8S + Sand Pack (2-foot minimum <br /> above top of screen) <br /> pJ � 10' 2" Dia. Well Screen <br /> 5" Min 3" Sand Pack Below Casing <br /> 200 2"Casing 2"Annulus <br /> 6-5/8" Dia. Borehole NOT TO SCALE <br /> TYPICAL DEEP MONITORING WELL CONSTRUCTION <br /> GES WORK PLAN ADDENDUM <br /> Ripon Farm Services <br /> 938 Frontage Road,Ripon,California <br /> GENESIS ENGINEERING & REDEVELOPMENT Designed: JC Project Number: 106 N 1 Figure <br /> A2 <br /> 351 Ruess Road Ripon, CA 95366 Drawn: AW File: TYPMONWELL <br /> Tel: 209.599.2004 Fax: 209.433.3990 Checked: JC Revision: Date: 02/23/10 <br />