Laserfiche WebLink
' Mr. Allan Fetters - 3 - 13 June 2007 <br /> Next Steps <br /> Ripon Farm Service needs to continue the investigation into the lateral and vertical extent of <br /> nitrate pollution in soil and groundwater at the Ripon Farm Service facility. Please provide a <br /> work plan that develops the following avenues of investigation: <br /> • Provide a vertical profile of nitrogen in soil and groundwater beneath potential source <br /> areas. <br /> • Test the integrity of the containment and stormwater collection system. <br /> • Evaluate the integrity of the on-site supply well and its seal. <br /> • Determine the influence, if any, of pumping cycles from Municipal Well 12 and the on-site <br /> supply well on groundwater movement observed at the on-site shallow wells. <br /> • Propose a means to estimate what portion of the nitrate observed in Municipal Well W-12, <br /> if any, might be attributed to Ripon Farm Service. <br /> Ripon Farm Service samples the on-site and off-site wells quarterly for nitrate, ammonium, <br /> and water surface elevation. Please add the following to the quarterly monitoring events: <br /> • The on-site water supply well should be sampled for groundwater surface elevation and <br /> nitrogen compounds. <br /> • Obtain water surface elevations from on-site wells MW-4, MW-5, MW-101 , MW-102, <br /> MW-103, MW-104, the water supply well and off-site wells RMW-1 S-R, RMW-2S, <br /> RMW-3S during the same groundwater elevation monitoring event. <br /> Regional Water Board staff will prepare a monitoring and reporting program for your review <br /> and comment, which will be transmitted under separate cover. <br /> Changes to Reports <br /> With a few modifications, the monitoring reports provided by Genesis Engineering and <br /> Advanced GeoEnvironmental could be made more useful to the reader. Genesis Engineering <br /> needs to include a column in the Groundwater Elevations table that identifies the screen <br /> interval of each well. Genesis Engineering also needs to provide a diagram illustrating the <br /> measured groundwater contours of the shallow water-bearing zone, and include the location of <br /> Municipal Well 12 on its figures. <br /> Advanced GeoEnvironmental should include at least one figure that shows the western portion <br /> of the site, the off-site monitoring wells, and Municipal Well 12. Advanced GeoEnvironmental <br /> also needs to include a table that shows the general mineral analytical data obtained. General <br /> mineral data was presented in the 27 October 2006 Limited Subsurface Investigation Report, <br /> the 11 December 2006 Quarterly Report— Fourth Quarter 2006, and the 5 March 2007 <br /> Quarterly Report— First Quarter 2007. <br /> Summary <br /> Please provide a work plan to evaluate the depth and extent of on-site pollution in soil and <br /> groundwater by 10 August 2007. Please add the water supply well to the on-site monitoring <br /> well sampling events, measure all shallow groundwater elevations at the same event, and <br /> implement the above listed modifications to regular monitoring reports. Regional Water Board <br /> staff look forward to working with Ripon Farm Service to develop answers to the questions of <br />