My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
932
>
2900 - Site Mitigation Program
>
PR0524571
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2020 2:35:36 PM
Creation date
5/1/2020 2:15:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0524571
PE
2960
FACILITY_ID
FA0016482
FACILITY_NAME
RIPON FARM SERVICE
STREET_NUMBER
932
Direction
S
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102007/11
CURRENT_STATUS
01
SITE_LOCATION
932 S FRONTAGE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CEPA <br /> GENESIS ENGINEERING&REDEVELOPMENT <br /> 1.0 INTRODUCTION <br /> This Phase II Site Characterization Work Plan Addendum("Work Plan Addendum")was <br /> prepared by Genesis Engineering& Redevelopment, LLC ("GE&R") in response to the <br /> requirements in the September 30, 2009 Regional Water Quality Control Board("RWQCB") <br /> letter, Conditional Concurrence with Phase II Site Investigation Workplan, Ripon Farm Service, <br /> 938 Frontage Road, Ripon, San Joaquin County(see Figure 1 for Site location). The activities <br /> described in this Work Plan Addendum are being conducted as additional defense related <br /> activities in support of the matter of the RF Land Inc. v. City of Ripon,et al. (Case No. <br /> CV025997—Superior Court for San Joaquin County). <br /> The July 7, 2009 Site Characterization Work Plan—Phase II is modified as discussed in the <br /> following sections. <br /> 2.0 SHALLOW AND DEEP BORINGS <br /> The proposed shallow boring near the Western Surface Water Sump will be replaced by a deep <br /> boring; as the sump is a suspected source area. Since two deep monitoring wells will be installed <br /> on the Site(see below),the Work Plan is modified to replace the proposed shallow boring near <br /> the Western Surface Water Sump with one of the two requested deep monitoring wells. <br /> Continuous core soil samples will be collected from the monitoring well boring to record soil <br /> type information. Soil samples for chemical analyses will be collected at 20 foot depth intervals. <br /> The soil samples will be tested for the same suite of analytes as discussed in the Work Plan. <br /> Upon completion of the borehole,the boring will be completed as a deep monitoring well(see <br /> below). The location of this deep boring/monitoring well is shown on Figure 2. <br /> All of the deep and shallow exploratory borings will be sealed using a grout slurry consisting of <br /> cement and water. The grout composition and placement will be consistent with San Joaquin <br /> County Department of Environmental Health ("SJCDEH") guidelines and with the concurrence <br /> of the SJCDEH inspector at the Site. <br /> One additional change is being made to the proposed shallow and deep boring program. Based <br /> on access restrictions,the proposed deep boring within the Dry Bulk Fertilizer <br /> Storage/Containment area has been eliminated. <br /> Ripon Farm Services I of 5 <br /> Site Characterization Work Plan—Phase II <br /> November 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.