Mr. Alan Fetters and Mr. Buo uenOuden -3- 17 February 2010 <br /> © Submit a deep monitoring well design for monitoring wells and for an extraction well for <br /> Central Valley Water Board staff concurrence prior to installation. This may be submitted <br /> electronically. <br /> ® An aquifer test at the deep extraction well shall be conducted to estimate the cone of <br /> influence of a future groundwater extraction operation and to estimate the horizontal <br /> conductivity and to estimate the vertical conductivity between the shallow and the deeper <br /> aquifer. A short letter format wort: plan shall be submitted to Central Valley Water Board <br /> staff at least two weeks prior to conducting this aquifer test. <br /> ® All borings shall be logged for lithology. <br /> o Soil samples and a terminal grab groundwater sample shall be taken from a deep boring <br /> located near the cement ponds to the east to develop a vertical nitrogen profile and <br /> lithologic log. Soil samples shall be obtained from 10 feet bgs, 15 feet, 20 feet and at 20- <br /> foot intervals until deeper groundwater is encountered at about 190 feet bgs. Soil samples <br /> and the groundwater sample shall be analyzed for nitrate and ammonium at the minimum. <br /> ® Submit a diagram illustrating where this deep boring will be located near the eastern <br /> cement-lined ponds. This may be submitted to Central Valley Water Board staff <br /> electronically. <br /> For convenience, the following conditions are repeated from Central Valley Water Board <br /> staff's 30 September 2009 conditional concurrence letter for the July 2009 Site <br /> Characterization Work Plan, Phase ll. The other condition requesting an Addendum has been <br /> satisfied. <br /> ® Before disposing of aquifer test water, provide assurance that the water quality and <br /> delivery location is acceptable to the City of Ripon or that an alternate disposal location is <br /> acceptable to Central Valley Water Board staff. <br /> ® All shallow and deep borings, monitoring wells, and the extraction well shall be installed to <br /> the satisfaction of San Joaquin County Environmental Health Department. <br /> Thank you for making the above adjustments to the work plan in an effort to streamline and <br /> complete the characterization phase. Provide the well design diagrams and revised boring <br /> location diagram by 26 February 2010 and implement the work plan by 26 March 2010. The <br /> Report of Results is due by 25 June 2010. Failure to comply with the directives set forth in <br /> this letter, or failure to meet the aforementioned due dates, unless an extension of such dates <br /> are requested and approved by Central Valley Water Board staff will result in the consideration <br /> by the Central Valley Water Board of enforcement actions against you. <br /> If you have any questions, you may contact me by telephone at (916) 464-4680 or by email at <br /> atefrell@waiiterboards.ca.gov. <br /> ,✓ i�1. � <br /> AMY TERRELL <br /> Private Sites Cleanup Unit <br /> Enclosure <br /> Distribution List Attached <br /> RECEIVED FEB 2 3 2010 <br />