Laserfiche WebLink
CSE <br /> GENESIS ENGINEERING& REDEVELOPMENT <br /> • Soil descriptions follow the name of the predominant particle size <br /> • Dimensions of the predominant and secondary sizes shall be estimated <br /> Additional information that will be entered on the boring log includes: <br /> • Boring identification <br /> • Location in relation to an easily identifiable landmark <br /> • Name of drilling contractor <br /> • Drilling method <br /> • Depth at which saturated conditions are first encountered <br /> • Sample depths <br /> • Zones of caving or heaving <br /> • Drilling rig reactions such as chattering, rod drops, and bouncing <br /> • Refusal <br /> A California Registered Geologist will review and approve the boring logs. <br /> 2.4 Decontamination Activities <br /> All equipment that may directly or indirectly contact samples will be decontaminated prior to <br /> use. This includes drill bits, drill rods,the portion of drill rig that stands above the borehole, <br /> sampling devices, and instruments such a borehole depth sounders. In addition, care will be <br /> taken to prevent samples and sampling equipment from coming into contact with potentially <br /> contaminating substances such as fugitive dust, tape, oil, engine exhaust, corroded surfaces, <br /> dirt, or any airborne source of contamination. A temporary decontamination station shall be <br /> set up at the Site to contain decontamination water. Decontamination water will be <br /> containerized in U.S. Department of Transportation("DOT") IA2-rated drums, or <br /> equivalent. Waste handling is discussed in Section 2.5. <br /> 2.4.1 Field Equipment Decontamination <br /> The following procedures shall be used to decontaminate all large pieces of equipment, such <br /> as drill rods: <br /> 1. External surfaces of equipment shall be washed with high-pressure hot water <br /> and AlconoxTM. In some cases, more vigorous decontamination procedures, <br /> such as scrubbing, shall be required if visible material remains on the down <br /> hole drilling tools after high-pressure washing. <br /> Ripon Farm Services,Inc. 6 of 15 <br /> Sampling and Analysis Plan <br /> July 2009 <br />