My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
932
>
2900 - Site Mitigation Program
>
PR0524571
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2020 2:32:29 PM
Creation date
5/1/2020 2:24:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0524571
PE
2960
FACILITY_ID
FA0016482
FACILITY_NAME
RIPON FARM SERVICE
STREET_NUMBER
932
Direction
S
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102007/11
CURRENT_STATUS
01
SITE_LOCATION
932 S FRONTAGE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CSE <br /> GENESIS ENGINEERING & REDEVELOPMENT <br /> If the field data is recorded on an appropriate data collection form, then all the data need not <br /> be recorded in the logbook. A brief description of the sampling data along with the reference <br /> to the data forms used will be recorded to ensure that the field data forms can be referenced <br /> to the specific logbook entry. <br /> In addition to field logbooks, field personnel will complete other records of field activities, as <br /> appropriate. A list of the appropriate forms, as well as a brief summary of information to be <br /> recorded follows: <br /> • Boring Log Form—description of subsurface conditions at boring locations <br /> • Chain-of-Custody Record—instructions to the laboratory as to the appropriate <br /> analytical method(s) for each sample <br /> Recorded information shall summarize, organize, and/or clarify data. If corrections are <br /> necessary, these shall be made by drawing a single line through the original entry(in such a <br /> manner that the original entry can still be read). The corrected entry shall be written <br /> alongside the corrections and shall be initialed and dated. Completed forms will be provided <br /> in the draft and final Site Investigation reports. <br /> Ripon Farm Services,Inc. 15 of 15 <br /> Sampling and Analysis Plan <br /> July 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.