My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
932
>
2900 - Site Mitigation Program
>
PR0524571
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2020 2:32:29 PM
Creation date
5/1/2020 2:24:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0524571
PE
2960
FACILITY_ID
FA0016482
FACILITY_NAME
RIPON FARM SERVICE
STREET_NUMBER
932
Direction
S
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102007/11
CURRENT_STATUS
01
SITE_LOCATION
932 S FRONTAGE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California gional Water Quality Cont l Board <br /> Central Valley Region <br /> Karl E.Longley,ScD,P.E.,Chair <br /> Linda S.Adams 11020 Sun Center Drive 11200,Rancho Cordova,California 95670-6114 Arnold <br /> Secretary for Phone(916)464-3291 °FAX(916)464-4645 Schwarzeneg; <br /> Environmental http://www.waterboards.ca.gov/centralvalle-y Governor <br /> Protection <br /> 3 April 2009 <br /> I '. APR 7 2009 <br /> Mr. Allan Fetters `- <br /> RF Land, Inc. ` �~ <br /> 3705 Portsmouth Circle North _�-��------- <br /> Stockton, CA 95219-3842 <br /> SUPPLY WELL DESTRUCTION WORK PLAN, RIPON FARM SERVICE, INC., <br /> 938 FRONTAGE ROAD, RIPON, SAN JOAQUIN.COUNTY <br /> Thank you for providing the 9 March 2009 Work Plan for Destruction of Water Supply <br /> Well, prepared by Ground Zero Analysis, Inc. and the 10 March 2009 Blasting Work <br /> Plan prepared by Water Well Technology, Inc. The well destruction work plan applies <br /> specifically to the on-site supply well, and since the site is currently vacant, a <br /> replacement.water supply is not required at this time. <br /> The Work Plan proposes to remove the pump and interior piping, excavate around the <br /> casing to a depth of three feet, and cut the casing off six inches above the excavation <br /> base. Explosives will be attached to the tremie pipe and the casing filled with cement. <br /> The explosives will then be detonated, and cement will be placed to fill any remaining <br /> cavities and form a cap around the casing, extending to ground surface. <br /> The 10 March Blast Plan was corrected on 27 March to state that.the total depth of <br /> casing is 196 feet, as shown in the Blast Plan diagram, not 100 feet as initially stated. <br /> Regional Water Quality Control Board, Central Valley Region staff conditionally concur <br /> with the Work Plan, provided that the following changes are incorporated into the well <br /> destruction Work Plan and Blast Plan. <br /> 1. The.casing shall be excavated to a depth of at least 5.5 feet below ground surface, <br /> and the casing shall be cut off six inches above the excavation depth. This allows <br /> for more flexibility for future land uses,and associated Land surface modifications. <br /> 2. The blasting caps shall not be attached to the tremie pipe, but shall be placed on a <br /> separate string. This may avoid complications relating to incomplete cement <br /> penetration. <br /> 3. The well destruction work shall be conducted to the satisfaction of San Joaquin <br /> County Environmental Health Department. <br /> California Environmental Protection Agency <br /> C1*Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.