My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
932
>
2900 - Site Mitigation Program
>
PR0524571
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2020 2:32:29 PM
Creation date
5/1/2020 2:24:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0524571
PE
2960
FACILITY_ID
FA0016482
FACILITY_NAME
RIPON FARM SERVICE
STREET_NUMBER
932
Direction
S
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102007/11
CURRENT_STATUS
01
SITE_LOCATION
932 S FRONTAGE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENESIS ENGINEERING&REDEVELOPMENT <br /> Ms. Amy Terrell <br /> August 21, 2006 <br /> Page 6 <br /> Task 4-Surveying <br /> The location and elevation of the new monitoring wells will be surveyed by a state-licensed <br /> surveyor. Vertical control will be relative to a United States Coast&Geodetic.Survey <br /> (USCCGS) or U. S. Geological Survey marker. Well and boring elevations will be recorded to <br /> within 0.01 foot. Horizontal locations will be referenced to the State Plane Coordinate System. <br /> The horizontal grid coordinates of each monitoring well will be recorded to within 0.1 foot. <br /> Task 5—Waste Disposal <br /> Soil and water generated during the installation, development, and sampling of the monitoring <br /> wells will be placed in Department of Transportation approved 55-gallon drums or roll-off <br /> storage bins and temporarily stored near each well. A licensed waste disposal contractor will <br /> properly manage,transport,and dispose of all wastes. A representative of Ripon Farm Services <br /> will sign all waste manifests and shipping documents. <br /> Task 6—Site Investigation Report <br /> A report summarizing the results of the work activities associated with this Work Plan will be <br /> prepared. The report will include tables,maps, figures, and appendices summarizing the data <br /> collected during the field activities. The report will include an interpretation of groundwater <br /> flow direction in the shallow and deeper saturated intervals, and will discuss the delineation and <br /> characterization of impacts to groundwater at and in the vicinity of the Site. <br /> SCHEDULE <br /> The following is a tentative schedule for completing the work included in this Work Plan: <br /> 1. Following receipt of an authorization to proceed,pre-field activities will be completed <br /> within approximately 2 weeks; <br /> 2. Field activities will be scheduled for the earliest possible dates,with monitoring well <br /> installations expected to be completed in approximately 2 weeks from the start date; <br /> 3. Development and sampling of the wells will be completed within approximately 2 weeks <br /> following installation of the wells; and <br />
The URL can be used to link to this page
Your browser does not support the video tag.