My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
932
>
2900 - Site Mitigation Program
>
PR0524571
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2020 2:32:29 PM
Creation date
5/1/2020 2:24:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0524571
PE
2960
FACILITY_ID
FA0016482
FACILITY_NAME
RIPON FARM SERVICE
STREET_NUMBER
932
Direction
S
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102007/11
CURRENT_STATUS
01
SITE_LOCATION
932 S FRONTAGE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05 July 2005 <br /> AGE-NC Project No. 95-0137 <br /> Page 5 of 8 <br /> • North of the liquid fertilizer batch plant area to characterize ground water. <br /> The proposed ground water monitoring well locations will be advanced to approximately 15 feet <br /> below first encountered ground water utilizing hollow-stem drilling techniques. Total depths of <br /> borings may vary according to hydrogeologic/geologic conditions encountered during drilling. <br /> 3.3. MONITORING WELL DEVELOPMENT AND SURVEY <br /> Following installation, each well will be developed to maximize water flow and minimize the <br /> amount of fine-grained sediment drawn into the well during pumping or bailing. After well <br /> development,the location and top of each well casing(well head)will be surveyed.Procedures for <br /> well installation, development and survey are presented in Sections 4.2. and 4.3.,respectively. <br /> 3.4. GROUND WATER SAMPLE COLLECTION AND ANALYSIS <br /> Ground water monitoring and sampling activities for each newly installed ground water monitoring <br /> well will be conducted on a quarterly basis unless an alternate schedule or suspension of monitoring <br /> is approved or required.Ground water monitoring activities will include recording depth to ground <br /> water measurements and collection of ground water samples for laboratory analysis.Ground water <br /> sample collection procedures are described in Section 4.4 and depicted in Tablel. <br /> Ground water samples will initially be analyzed by a State of California Department of Health <br /> Services(DHS)-certified laboratory for: <br /> • Nitrates in accordance with EPA Method 300; <br /> • Ammonia(as Nitrogen)in accordance with EPA Method 350.3 and <br /> • pH in accordance with EPA Method 150.1. <br /> 3.5. PREPARATION OF REPORT OF FINDINGS <br /> Following each ground water monitoring event,a quarterly report will be prepared presenting the <br /> findings. Each report will include a description of work performed and the results of the <br /> groundwater monitoring, sampling and analysis. Laboratory reports for ground water analyses, <br /> testing methods, laboratory quality assurance/quality control (QA/QC)reports, and sample chain <br /> of custody documentation will be presented in the quarterly report. Conclusions and <br /> recommendations will also be included, if applicable. <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.