My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
932
>
2900 - Site Mitigation Program
>
PR0524571
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2020 2:32:29 PM
Creation date
5/1/2020 2:24:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0524571
PE
2960
FACILITY_ID
FA0016482
FACILITY_NAME
RIPON FARM SERVICE
STREET_NUMBER
932
Direction
S
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102007/11
CURRENT_STATUS
01
SITE_LOCATION
932 S FRONTAGE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05 July 2005 <br /> AGE-NC Project No. 95-0137 <br /> Page 7 of 8 <br /> not more than 6 gallons of water per 94-pound sack of cement.The grout will be placed by pumping <br /> through tremie pipe. The EHD will be notified for grout inspection at least 72 hours prior to <br /> conducting grouting procedures. The well design is depicted in Figure 3. <br /> 4.3. WELL DEVELOPMENT AND SURVEY <br /> Development will consist of a combination of bailing to remove the major portion of fine-grained <br /> sediment from inside the well, surging to flush out or draw in sediment from the filter pack, and <br /> additional bailing to finish the removal of sediment.Development activities will be continued until <br /> field parameter (pH, electrical conductivity, and temperature) readings have stabilized. Purged <br /> ground water will be temporarily containerized in properly labeled DOT-approved model 17H <br /> 55-gallon drums and stored on-site.Each well-head elevation and well location will be surveyed by <br /> a California-licensed surveyor relative to the closest San Joaquin County, United State Geologic <br /> Service(USGS)or City of Ripon benchmark. <br /> 4.4. GROUNDWATER SAMPLING PROCEDURES <br /> Ground water sample collection will be performed each quarter in accordance with the plan's <br /> guidelines and the following procedures.The RFS nutrient monitoring also will include monitoring <br /> well samples from the western portion of the site,from a minimum of four established wells along <br /> with the new wells. <br /> 4.4.1. Static Water Level Measurements <br /> Before purging and sampling during ground water monitoring events, static water level will be <br /> measured using an electric water level indicator. Water level data will be recorded to the nearest <br /> 0.01-foot from a reference point marked at the top of the PVC well casing.Water level and the time <br /> of the measurement will be recorded on a field log. Before and after each use, the measurement <br /> device will be rinsed with water. <br /> 4.4.2. Well Evacuation <br /> Subsequent to measurement of depth to water and prior to sampling,the well will be purged using <br /> a submersible pump or a disposable bailer to ensure that the sample is representative of the <br /> formation,rather than water standing in the well casing.The well will be purged until: 1)a minimum <br /> of three casing-water volumes is removed from the well;and/or 2)the field-measured ground water <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.