My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
0
>
2900 - Site Mitigation Program
>
PR0531183
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:56:12 PM
Creation date
5/1/2020 4:12:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0531183
PE
2950
FACILITY_ID
FA0020084
FACILITY_NAME
CALTRANS RIGHT OF WAY
STREET_NUMBER
0
Direction
S
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
VARIOUS
CURRENT_STATUS
01
SITE_LOCATION
S HWY 99 RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t I <br /> 2.1.4 Proiect Field Staff <br /> Project personnel are responsible for: <br /> • Complying with the provisions of this HSP; <br /> • Performing services in a manner that is consistent with good health and safety practice; and <br /> • Reading and being knowledgeable of the contents of this HSP. <br /> 2.2 Personnel Training <br /> 2.2.1 General Site Employees <br /> Site employees will attend a project orientation prior to starting the project. The orientation will review <br /> all elements of the HSP, including: 1) the location of potential health and safety hazards on the site; <br /> and 2) requirements of the HSP. The training will also address other Cal/OSHA requirements such as <br /> the Geocon Hazard Communication Program (T8 CCR §5194), including the potential hazards of <br /> exposure to asbestos and heavy metals (inorganic lead - T8 CCR §§1529(k) and 1532.1(1) <br /> respectively), and the Injury and Illness Prevention Program(T8 CCR §3203; CSO §1509). <br /> 2.2.2 Asbestos Survey Activities <br /> Geocon personnel performing asbestos survey activities on this project must have completed the <br /> requisite AHERA training and hold a current Certification from the California Division of <br /> Occupational Safety and Health(Cal/OSHA)as either: (ref. T8 CCR§341.15; §1529(o)): <br /> • A Certified Asbestos Consultant(CAC); or <br /> • A Certified Site Surveillance Technician(CSST); or <br /> • Perform asbestos survey tasks under the direct supervision of one of the above. <br /> 2.2.4 "Tailgate" Meetings <br /> During the active field components of the project,the Project Manager or designee will conduct regular <br /> (i.e., weekly or daily, as appropriate) "tailgate" safety meetings. This meeting will include information <br /> on the following subjects, as applicable: <br /> • Changes to project scope; <br /> • Recognized changes to site conditions; <br /> • Review of safe work practices; <br /> • On or off the project safety practices; <br /> • Feedback from employees on hazards,safety suggestions, or concerns; and <br /> • Recognition for compliance, good safety performance or attitude. <br /> Attendance at the tailgate meetings is considered a part of each employee's job responsibilities. <br /> 2.3 Medical Surveillance <br /> Stockton 6-Lane,Task Order No.82 Caltrans Contract 06A1141,EA 10-03A1001 <br /> Project No.S9200-06-82 -4- December 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.