Laserfiche WebLink
PAkADISO MECH*NICAL, INC. <br /> GENERAL & PETROLEUM CONTRACTORS <br /> and ENVIRONMENTAL SERVICES <br /> P.O.BOX 1838 LICENSE NO.67"7909 <br /> 2600 WILLIAMS STREET PHONE(510)614-8390 <br /> SAN LEANDRO.CA 94577 FAX(510)614-8396 <br /> Pipe Cutting/Removal Procedure <br /> 1. Safety tailgate meeting at jobsite discussing site—specific concerns and work <br /> procedures before work commences. <br /> 2. Contractor to remove dispensers and vacuum piping dry using explosion- <br /> proof pneumatic vacuum. <br /> 3. All residual product will be returned to UST's <br /> 4. Contractor will remove concrete overburden and expose all piping. <br /> 5. Isolate product lines from UST <br /> 6. Cold cut FRP pipe with manually operated saw per industry standards. <br /> 7. FRP pipe pieces will be drummed and labeled. <br /> 8. Drums will be transported by Belshire Environmental Services, to US <br /> Ecology for disposal. <br /> Note: <br /> Any changes or alterations to this procedure must be approved by Eric V. Montesano <br /> (Safety Director) <br />