My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008 - 2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_2008 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 4:03:53 PM
Creation date
5/4/2020 9:32:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2009
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fiber Glass Systet- 9 Fiber Glas_ stems 9 <br /> C;143 • .j,'Ai I ii Y`;•jl.i�LA )1 4,1111 4 4 iv;. tis<e_ASC � <br /> _1 d <br /> M I ck �O y(finll has successfully completed Bonder �O�Q1(j C• ,Jr a has successfully completed Bonder <br /> Training as set forth in the SMITH FIBERCAST Total Quality Installation Program Training as set forth In the SMITH FIBERCAST Total Quality Installation Program <br /> for the installation of UL listed primary and secondary containment products. for the installation of UL listed primary and secondary containment products. <br /> 0511CkO-:?, '31 C (7 <br /> Date Date <br /> Renewal of the bonder rvNficaldn s recnm rerdetl eery three years or when <br /> Renewal of the border ceNfiralion s remmrterded every Ma"iyears a when <br /> the~perk bonding process ties riot oeen praUlced Our a period of 8 rtontf♦l the specific bol process has nor been padicaa for a pern0 of a mon(he <br /> Fiber Glass Systems W : ; Fiber Glass Sys ems Is¢ <br /> t i ; <br /> STAR ;,'11:iii Fii3cFtCAS <br /> a h�„-� has successful completed Bonder <br /> l�nbeYk �' �L1r1 has successful completed Bonder <br /> Training b p <br /> N W g as set forth.n the SMITH FIBERCAST Total Quality Installation Program <br /> Training as set forth n the SMITH FIBERCAST Total Quality Installation Program i for the installation of UL listed primary and secondary containment products <br /> for the installation d UL listed primary and secondary containment products. <br /> Date Date <br /> f+ <br /> Rer)ewel of the bonder ix Nficatnn s recornmended every lhra"years or when <br /> Renewal of the bonder�:aNfiCalgn s recomrreMed awry Three yeah or whMr the speck bordirig Process has not been p"'bad for a Pal of 8 mortis. <br /> the speak;binding process hes nor been praaired for a perod of a in)nille. <br /> •ter ' � <br /> Fiber Glass Systems I Fiber Glass Systems <br /> Y <br /> AA 1/i �n✓�Ci I S� nos successfully completed Bonder <br /> Training as set forth n the SMITH F IBERCAST Total Quality Installation Pogram � C e To U I OY has successfully completed Bonder <br /> Training as set forth n the SMITH FIBERCAST Total Quality Installation Program ' <br /> for the installation d UL bribed primary and secondary containment products I <br /> inrim <br /> for the installation of UL listed primary and secondary containment products. <br /> g I <br /> Date I C'51ael <br /> Date <br /> Renewal of the border"'nes"W"a remrrenerded a`rary thea"Y'al"he" <br /> the spec Ac bond,,Process has not been praUiced for a pa'od of 8 months Renewal of the ding pi —m has n t re"practical <br /> every Biba"years or when <br /> ;rte+pacific bonding prose.s has not brei praUced kr a period of 8 months. <br /> Fiber Glass Systems 0't Fiber Glass Systems ov <br /> L r I C 1 Mel)7C'-jL-L()C) has successfully completed Bonder L•�-� ✓� L%C 3 has successfully completed Bonder <br /> Training as set forth n the SMITH FIBERCAST Total Quality Installation Program Training as set forth.n the SMITH FIBERCAST Total Quality Installation Program <br /> for the installation of UL listed primary and secondary contabnment products for the installation of UL listed primary and secondary containment products. <br /> Date Date <br /> Renrwnl of the bi—k untifirdlion is recommended every three years or when Renewal of the bonder c-lificarion s—nerenled every three year or when <br /> the sf*rJlla boldlag flab ss has in(been practiced for a period of 8 months the st)el'1rK bonding pros > has nil torn prnrrfbd for a period of 8 nTmrhs. <br /> Fiber Glass Systems 0.- <br /> -Mike, <br /> ..MIke G i Y C-Q has successfully completed Bonder <br /> I raining as set forth.n the SMITH FIBERCAST Total Quality Installation Program <br /> for the installation of UL listed primary and secondary containment products. <br /> d51C8j0-f <br /> Date <br /> Ran"coal ul the border vt fificdhon s rolkmper dad awry Three years or when <br /> 'ha•:pe LN t1oM1Nng pinfess ha91a)t Aeeil prflClNad fa a(Road Ota nx)ntha <br />
The URL can be used to link to this page
Your browser does not support the video tag.