Laserfiche WebLink
5. SECONDARY PIPE TESTING <br /> Professional Engineer <br /> Test Method Developed By: ❑Piping Manufacturer ®Industry Standard ❑ '— <br /> []Other(Specify) " L-]Hydrostatic <br /> ®Pressure p Vacuum <br /> Test Method Used: �Other(Specify) <br /> Equipment Resolution:0 to 15"Psi <br /> Test Equipment Used: DIAL GAUGE Piping Run# <br /> Piping Run# <br /> Piping Run# 7 Piping Run# g p Fiberglass Fiberglass <br /> Fiberglass Fiberglass <br /> Piping Material: — S,1 r 7- <br /> Piping Manufacturer: %>/7`f/ S t> %�3 . 1-� <br /> $ , <br /> Piping Diameter: 3• S 4, 'ep z> _ <br /> Length of Piping Run: t' G' 91 <br /> Product Stored: A� — <br /> Method and location of <br /> t-5'/ /J��2� <br /> i in -run isolation: J y ~ <br /> Wait time between applying 15 Minutes 15 Minutes <br /> 15 Minutes 15 Minutes <br /> pressurelvacuumlwater and <br /> starting test; <br /> Test Start Time: 5 pSl 5 PSI 5 PSI <br /> Initial Reading.(Rr): 5 PSI -� <br /> Test End Time: — psi PSI PSI <br /> Final Reading(RF): psi 1 Hour <br /> 1 Hour 1 Hour 1 Hour <br /> Test Duration: PSI ——�- PSI PSI PSI <br /> —�` -- <br /> Change in Reading(RF-RO: Zero <br /> ail Threshold or Zero Zero <br /> PasslF Zero <br /> Criteria: r� Pte ` <br /> '4..i .:.`rY.S-. � }-. '° <br /> v.. DMI m. <br /> T <br /> _Comments—(include information on repair's made riorto testing, arrd recommended follow-u or�fai d Cts) <br /> �r�1i�L�C r7LL �lrc`55��/ZC <br /> l�� <br />