Laserfiche WebLink
Page iS _of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ LEquipment <br /> � _Test Method Developed By: n Spill Bucket Manufacturer ®Indd ❑Professional Engineer❑Other(Specify) <br /> Test Method Used: L7 Pressure ❑Vac ®Hydrostatic <br /> El Other(Sped) <br /> Test Equipment Used:Wayne Perry Inc.See Attached Results Resolution:.0007 _ <br /> SpiWvetfill Containment Box Number- <br /> Bucket <br /> umberBucket Diameter- <br /> Bucket Depth: j %' i /5r ! l 3 i <br /> Wait time between applying <br /> pressure/vact urn/water and 15 Minutes 15 Minutes 15 Minutes 15 MInute, 1nutes 1 S Minutes 15 Minutes 15 Minutes <br /> starting test: _Test Start Time: 5 ' /_! / _ /Initial Reading(Ri): f/ & . •2,2 v / / / C.,2 >�,i✓f� s' <br /> Test End Time: _ ��,-.,r _-- <br /> Final Reading(RF): % /4"c., /7, z04 •ll.. �'3 !_ / <br /> Test Duration: ,'.�>', / .rl i r •-7� / '.�: Y:7,:., r <br /> Change in Reading(RF-RD: vcr<s i r 000 z`4 �/'r- �• r� c�fl/ �pc� <br /> Pass/Fail Threshold or _0.0020 0.0020 -0..0020 -0 0020 -0.0020 -0..0020 -0.0020 0..0020 <br /> Criteria- <br /> Comments—(include!n2 orntation on repairs made prior to testing,and recownended follow-up for failed rests) <br />