Laserfiche WebLink
9255517888 Line 1 P" 14:29 a.m. 10-27-2009 5/11 <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 2 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed YES[] NOV <br /> 2. Manufacturer's spec sheets attached for all equipment to be installed YES&y NO [] <br /> 3. Description of work to be completed (if adding piping, UDC's, or other UST equipment, or performing tank top upgrade, <br /> use the UST Installation Application pages 4-8 as necessary for a timely plan review): <br /> PGPI ACE POSITION SENSITIVE SENSOR 110 794380-321)ON 87 Ell I.SUMP <br /> 4. Description of equipment to be used (Attach drawings/blueprints as necessary): <br /> VEEDER-ROOT POSITION SENSITIVE PAN/SUMP SENSOR(794380-323) <br /> 5. All equipment is State certified or approved. YES S(NO [] <br /> 6. Decontamination Procedures: <br /> a. Will piping be decontaminated prior to removal? YES[] NO[] <br /> b. Identify contractor performing decontamination: <br /> Name Phone( ) <br /> Address City Zip <br /> c. Describe method to be used for decontamination: <br /> d. Describe how rinsate material will be stored onsite prior to manifesting offsite: <br /> e. Rinsate Hauler and permitted Treatment, Storage&Disposal Facility: <br /> Hauler Name Phone( ) Hauler Reg# <br /> Address City Zip <br /> Permitted Disposal Site <br /> 7. a. Describe the method that will be utilized to purge and/or inert the piping: <br /> b. Piping Hauler: <br /> Name Phone( } <br /> Address City Zip <br /> Hauler Registration#(if hauled as hazardous) <br /> c. Piping Disposal Site: <br /> Name Phone( ) <br /> Address City Zip <br /> EPA ID#(if transported to a permitted TSD facility) <br /> 8. Is the sampling firm an independent third party from the contractor? YES [] NO[] <br /> 9. Describe, in detail, how the soil and/or water sample(s)beneath the piping or dispenser will be obtained: <br /> 10. Handling of excavated soil(Contaminated Soil Hazardous Waste Hauler): <br /> Name Hauler Registration# Phone( } <br /> Address City Zip <br /> b)If soil is not to be hauled, describe what will be done with it: <br /> 2 <br />