Laserfiche WebLink
ARCO 6020 - Secondary Containment Test Page 1 of 1 <br /> Muniappa Naidu [EH] <br /> From: Ha, Ruth X[Ruth.Ha@bp.com] <br /> Sent: Tuesday, May 13, 2008 1:15 PM <br /> To: Muniappa Naidu [EH] <br /> Subject: ARCO 6020 -Secondary Containment Test <br /> Hi Muni <br /> ARCO#6020 had a secondary containment test completed on 03/19/08. Some portions of the secondary <br /> containment test(the UDCs, secondary piping, and the vapor buckets)failed. The cost estimates we are getting <br /> for completing the repairs are coming in at—$250,000. <br /> The site is scheduled for a raise and rebuild which includes a new building, new canopy, new dispensers, and a <br /> new tank for diesel. In addition, we will be upgrading the site with the EVR requirements. <br /> If we proceed with the repairs, the dispensers that we repair will be removed during the raise and rebuild and <br /> replaced with vac-assist dispensers. <br /> Our consultant, Barghausen, has submitted a design & review permit to the City of Manteca (Jeff Ross)on <br /> 02/27/08. There is some drainage issues at the site with Cal Trans which is slowing down the process. The City <br /> of Manteca has indicated that we will get our final approval in June 2008. Once we receive the final approval from <br /> the City of Manteca, we will submit the applications with the construction drawing approved by the City of <br /> Manteca to San Joaquin APCD and San Joaquin EHD. <br /> In lieu of completing the repairs, we would like to continue operating the site and dispatch a pump &tank <br /> contractor on a daily basis to the site to verify the UST system. <br /> Please let me know how you would like to proceed. <br /> Ruth K. Ha <br /> Environmental Compliance Specialist <br /> HSSE Compliance& Assurance <br /> BP US Convenience Retail <br /> P.O. Box 6038 <br /> Artesia, CA 90702 <br /> 2 Phone: (503) 524-6191 <br /> Fax: (503) 524-2180 <br /> A Cell: (503) 475-2982 <br /> r;__ e-mail: ruth.haGbp.com <br /> 5/14/2008 <br />