Laserfiche WebLink
Describe the final land contours and water features: <br /> The excavation will be left as a depressed area of varying depths. Topsoil will <br /> replaced and the area will be suitable for crops or grazing. <br /> Describe measures to prevent soil erosion: All final slopes will be <br /> seeded with natural grasses. <br /> Describe measures to prevent water pollution ( if adjacent to <br /> waterway) : Surface water will be retained on the site. <br /> Describe measures to protect fish, wildlife and vegetation: N/A <br /> Describe the means of eliminating safety hazards and disposing of <br /> equipment at the end of operations (shafts, slopes, etc. ) : All <br /> final slopes will be graded to 1.5 to 1 or less and seeded. All equipment <br /> other than tarmng, will removed ram the site._ <br /> Quarry Excavation - 13 - ( 7/84 ) <br />